[1] Dionisio, C. S. (2017) A Project Manager's Book of Forms: A Companion to the PMBOK Guide, John Wiley & Sons
[2] Nguyen, T. L. A., and Vo, X. V. (2020) Does corporate governance really matter for bank efficiency? Evidence from ASEAN countries. Eurasian Economic Review 10, 681-706.
[3] Wang, J., Wu, P., Wang, X., and Shou, W. (2017) The outlook of blockchain technology for construction engineering management.
[4] Bertelsen, S., and Sacks, R. (2007) Towards a new understanding of the construction industry and the nature of its production. In 15th Conference of the International Group for Lean Construction pp. 46-56, Michigan State University, East Lansing, Michigan.
[5] Dadhich, P., Genovese, A., Kumar, N., and Acquaye, A. (2015) Developing sustainable supply chains in the UK construction industry: A case study. International Journal of Production Economics 164, 271-284.
[6] Bajjou, M. S., and Chafi, A. (2020) Empirical study of schedule delay in Moroccan construction projects. International Journal of Construction Management 20, 783-800.
[7] Assaf, S. A., and Al-Hejji, S. (2006) Causes of delay in large construction projects. International journal of project management 24, 349-357.
[8] Yang, J.-B., and Wei, P.-R. (2010) Causes of delay in the planning and design phases for construction projects. Journal of Architectural Engineering 16, 80-83.
[9] Singh, P. K., Saxena, D. K., and Kakade, V. B. (2023) Identification of success factors for oil and gas projects. In AIP Conference Proceedings Vol. 2888, AIP Publishing.
[10] Acharya, N. K., Dai Lee, Y., and Man Im, H. (2006) Conflicting factors in construction projects: Korean perspective. Engineering, construction and architectural management 13, 543-566.
[11] Barthorpe, S., Duncan, R., and Miller, C. (2000) The pluralistic facets of culture and its impact on construction. Property management 18, 335-351.
[12] Obi, R. (2012) Stress and conflict in organisation. Industrial Sociology. Ibadan, Spectrum Books Ltd .
[13] Ongori, H. (2009) Organisational conflict and its effects on organisational performance.
[14] Elhusseiny, H. O., Nosair, I., and Ezeldin, A. S. (2021) Systematic processing framework for analyzing the factors of construction projects’ delays in Egypt. Ain Shams Engineering Journal 12, 1501-1511.
[15] Alzuwaini, H., Vasil’Kov, D., Kirillov, N., Khitrov, A., Tolmachev, V., Okorokov, R., Gatsenko, O., and Zaripova, D. (2019) Problems of Petroleum industry in Iraq. In IOP Conference Series: Earth and Environmental Science Vol. 337 p. 012046, IOP Publishing.
[16] Suppramaniam, S. U. K., Ismail, S., and Suppramaniam, S. (2018) Causes of delay in the construction phase of oil and gas projects in Malaysia. Int. J. Eng. Technol 7, 203-209.
[17] Hamzah, N., Khoiry, M. A., Arshad, I., Tawil, N. M., and Ani, A. C. (2011) Cause of construction delay-Theoretical framework. Procedia engineering 20, 490-495.
[18] Memon, A. H., Abdul Rahman, I., and Aziz, A. A. A. (2011) Time overrun in construction projects from the perspective of project management consultant (PMC). Journal of Surveying, Construction and Property 2.
[19] Kazemi, A., Kim, E.-S., and Kazemi, M.-H. (2021) Identifying and prioritizing delay factors in Iran’s oil construction projects. International Journal of Energy Sector Management 15, 476-495.
[20] Kazemi, A., Katebi, A., and Kazemi, M.-H. (2018) Causes of delay in construction projects: The case of oil and gas projects. International Journal of Advanced Research in Engineering 4, 11-16.
[21] Zaman, U., Florez-Perez, L., Abbasi, S., Nawaz, S., Farías, P., and Pradana, M. (2022) A stitch in time saves nine: nexus between critical delay factors, leadership self-efficacy, and transnational mega construction project success. Sustainability 14, 2091.
[22] Vahedi Nikbakht, M., Gheibi, M., Montazeri, H., Yeganeh Khaksar, R., Moezzi, R., and Vadiee, A. (2024) Identification and Ranking of Factors Affecting the Delay Risk of High-Rise Construction Projects Using AHP and VIKOR Methods. Infrastructures 9, 24.
[23] Fallahnejad, M. H. (2013) Delay causes in Iran gas pipeline projects. International journal of project management 31, 136-146.
[24] Aljamee, H., Naeem, S., and Bell, A. (2020) The causes of project delay in Iraqi petroleum industry: A case study in Basra Oil Company. Journal of Transnational Management 25, 57-70.
[25] Gomarn, P., and Pongpeng, J. (2018) Causes of construction delay from contractors and suppliers in Thailand's oil and gas platform projects. In MATEC Web of Conferences Vol. 192 p. 02008, EDP Sciences.
[26] Derakhshanalavijeh, R., and Teixeira, J. M. C. (2017) Cost overrun in construction projects in developing countries, Gas-Oil industry of Iran as a case study. Journal of Civil Engineering and Management 23, 125-136.
[27] Abdellatif, H., and Alshibani, A. (2019) Major factors causing delay in the delivery of manufacturing and building projects in Saudi Arabia. Buildings 9, 93.
[28] Alhajri, A. R., and Alshibani, A. (2018) Critical factors behind construction delay in petrochemical projects in Saudi Arabia. Energies 11, 1652.
[29] Semple, C., Hartman, F. T., and Jergeas, G. (1994) Construction claims and disputes: Causes and cost/time overruns. Journal of Construction Engineering and Management 120, 785-795.
[30] Antoniou, F., and Tsioulpa, A. V. (2024) Assessing the Delay, Cost, and Quality Risks of Claims on Construction Contract Performance. Buildings 14, 333.
[31] Alshibani, A., Julaih, M., Adress, A., Alshamrani, O., and Almaziad, F. (2022) Identifying and Ranking the Root Causes of Schedule Delays in Oil and Gas Pipeline Construction Projects. Energies 16, 283.
[32] Kikwasi, G. (2012) Causes and effects of delays and disruptions in construction projects in Tanzania. In Australasian Journal of Construction Economics and Building-Conference Series Vol. 1 pp. 52-59.
[33] Tumi, S. A. H., Omran, A., and Pakir, A. H. K. (2009) Causes of delay in construction industry in Libya. In The International Conference on Economics and Administration pp. 265-272, Citeseer.
[34] Trauner, T. J. (2009) Construction delays: Understanding them clearly, analyzing them correctly, Butterworth-Heinemann.
[35] Sweis, G., Sweis, R., Hammad, A. A., and Shboul, A. (2008) Delays in construction projects: The case of Jordan. International journal of project management 26, 665-674.
[36] Choudhry, R. M., Aslam, M. A., Hinze, J. W., and Arain, F. M. (2014) Cost and schedule risk analysis of bridge construction in Pakistan: Establishing risk guidelines. Journal of Construction Engineering and Management 140, 04014020.
[37] Larsen, J. K., Shen, G. Q., Lindhard, S. M., and Brunoe, T. D. (2016) Factors affecting schedule delay, cost overrun, and quality level in public construction projects. Journal of management in engineering 32, 04015032.
[38] Kaliba, C., Muya, M., and Mumba, K. (2009) Cost escalation and schedule delays in road construction projects in Zambia. International journal of project management 27, 522-531.
[39] Ibironke, O. T., Oladinrin, T. O., Adeniyi, O., and Eboreime, I. V. (2013) Analysis of non-excusable delay factors influencing contractors' performance in Lagos state, Nigeria. Journal of Construction in Developing Countries 18, 53.
[40] Choudhry, R. M., and Iqbal, K. (2013) Identification of risk management system in construction industry in Pakistan. Journal of management in engineering 29, 42-49.
[41] Kadry, M., Osman, H., and Georgy, M. (2017) Causes of construction delays in countries with high geopolitical risks. Journal of Construction Engineering and Management 143, 04016095.
[42] Wu, G., Zhao, X., Zuo, J., and Zillante, G. (2018) Effects of contractual flexibility on conflict and project success in megaprojects. International Journal of Conflict Management 29, 253-278.
[43] Campbell, K., and O'Leary, R. (2015) Big ideas for big problems: Lessons from conflict resolution for public administration. Conflict Resolution Quarterly 33, S107-S119.
[44] Brockman, J. L. (2014) Interpersonal conflict in construction: Cost, cause, and consequence. Journal of Construction Engineering and Management 140, 04013050.
[45] Hasheminasab, S., Mortaheb, M., and Ahmadian F. F, A. (2014) Causes of common and frequent claims in oil, gas and petrochemical projects of Iran. KSCE Journal of Civil Engineering 18, 1270-1278.
[46] Harmon, K. M. (2003) Conflicts between owner and contractors: Proposed intervention process. Journal of management in engineering 19, 121-125.
[47] Honrao, Y., and Desai, D. (2015) Study of delay in execution of infrastructure projects-highway construction. International Journal of Scientific and Research Publications 5, 1-8.
[48] Kazemi, A., Nemat-Gorgani, A., and Aryaee, S. (2020) Delay in Oil Projects: Review of Past Developments and Provide a Model for Predicting Delay Time-Case Study: EPC Projects of the POGC. Journal of Improvement Management 13, 147-164.
[49] Han, L., Fang, B., Feng, W., and Zhou, W. (2023) Analysis of the Conflicts in the Process of Industrial Building Renovation Based on Grounded Theory: A China Study. Buildings 13, 676.
[50] Amoatey, C. T., and Ankrah, A. N. O. (2017) Exploring critical road project delay factors in Ghana. Journal of Facilities Management 15, 110-127.
[51] Apolot, R. E. (2011) Investigation of the causes of delay and cost overrun in construction projects in Uganda’s public sector. Makerere University.
[52] Kamanga, M., and V d M Steyn, W. (2013) Causes of delay in road construction projects in Malawi. Journal of the South African Institution of Civil Engineering= Joernaal van die Suid-Afrikaanse Instituut van Siviele Ingenieurswese 55, 79-85.
[53] Chen, G.-X., Shan, M., Chan, A. P., Liu, X., and Zhao, Y.-Q. (2019) Investigating the causes of delay in grain bin construction projects: the case of China. International Journal of Construction Management 19, 1-14.
[54] Durdyev, S., Omarov, M., and Ismail, S. (2017) Causes of delay in residential construction projects in Cambodia. Cogent Engineering 4, 1291117.
[55] Samarghandi, H., Mousavi, S., Taabayan, P., Mir Hashemi, A., and Willoughby, K. (2016) Studying the Reasons for Delay and Cost Overrun in Construction Projects: The Case of Iran.
[56] Ameh, O. J., and Osegbo, E. E. (2011) Study of relationship between time overrun and productivity on construction sites. International Journal of Construction Supply Chain Management 1, 56-67.
[57] Nematpour, S. (2020) Identify delayed factors in conditional design and construction projects (EPC Converted) and provide solutions to prevent their creation in the oil and gas industry. Civil and Project 2, 95-104.
[58] Frimpong, Y., Oluwoye, J., and Crawford, L. (2003) Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study. International journal of project management 21, 321-326.
[59] Sweis, R., Moarefi, A., Amiri, M. H., Moarefi, S., and Saleh, R. (2019) Causes of delay in Iranian oil and gas projects: a root cause analysis. International Journal of Energy Sector Management 13, 630-650.
[60] Al-Momani, A. H. (2000) Construction delay: a quantitative analysis. International journal of project management 18, 51-59.
[61] Hossain, M. A., Raiymbekov, D., Nadeem, A., and Kim, J. R. (2022) Delay causes in Kazakhstan’s construction projects and remedial measures. International Journal of Construction Management 22, 801-819.
[62] Mansfield, N. R., Ugwu, O., and Doran, T. (1994) Causes of delay and cost overruns in Nigerian construction projects. International journal of project management 12, 254-260.
[63] Chan, D. W., and Kumaraswamy, M. M. (1997) A comparative study of causes of time overruns in Hong Kong construction projects. International journal of project management 15, 55-63.
[64] Koushki, P., Al‐Rashid, K., and Kartam, N. (2005) Delays and cost increases in the construction of private residential projects in Kuwait. Construction management and economics 23, 285-294.
[65] Khoshgoftar, M., Bakar, A. H. A., and Osman, O. (2010) Causes of delays in Iranian construction projects. International Journal of Construction Management 10, 53-69.
[66] Khabisi, J., Aigbavboa, C., and Thwala, W. (2016) Causes of cost overruns in public sector construction projects in South Africa. In International Conference on Construction and Real Estate Management 2016 pp. 1311-1317, American Society of Civil Engineers Reston, VA.
[67] Abu El-Maaty, A. E., El-Kholy, A. M., and Akal, A. Y. (2017) Modeling schedule overrun and cost escalation percentages of highway projects using fuzzy approach. Engineering, construction and architectural management 24, 809-827.
[68] Abdelhadi, Y., Dulaimi, M. F., and Bajracharya, A. (2019) Factors influencing the selection of delay analysis methods in construction projects in UAE. International Journal of Construction Management 19, 329-340.
[69] Marzouk, M. M., and El-Rasas, T. I. (2014) Analyzing delay causes in Egyptian construction projects. Journal of advanced research 5, 49-55.
[70] Aziz, R. F., and Abdel-Hakam, A. A. (2016) Exploring delay causes of road construction projects in Egypt. Alexandria Engineering Journal 55, 1515-1539.
[71] Aibinu, A. A., and Odeyinka, H. A. (2006) Construction delays and their causative factors in Nigeria. Journal of Construction Engineering and Management 132, 667-677.
[72] Fugar, F. D., and Agyakwah-Baah, A. B. (2010) Delays in building construction projects in Ghana. Australasian Journal of Construction Economics and Building, The 10, 128-141.
[73] Sambasivan, M., Deepak, T., Salim, A. N., and Ponniah, V. (2017) Analysis of delays in Tanzanian construction industry: Transaction cost economics (TCE) and structural equation modeling (SEM) approach. Engineering, construction and architectural management 24, 308-325.
[74] Akogbe, R.-K. T., Feng, X., and Zhou, J. (2013) Importance and ranking evaluation of delay factors for development construction projects in Benin. KSCE Journal of Civil Engineering 17, 1213-1222.
[75] Bagaya, O., and Song, J. (2016) Empirical study of factors influencing schedule delays of public construction projects in Burkina Faso. Journal of management in engineering 32, 05016014.
[76] Johnson, R. M., and Babu, R. I. I. (2020) Time and cost overruns in the UAE construction industry: a critical analysis. International Journal of Construction Management 20, 402-411.
[77] Mahdi, I., and Soliman, E. (2021) Significant and top ranked delay factors in Arabic Gulf countries. International Journal of Construction Management 21, 167-180.
[78] Muneeswaran, G., Manoharan, P., Awoyera, P., and Adesina, A. (2020) A statistical approach to assess the schedule delays and risks in Indian construction industry. International Journal of Construction Management 20, 450-461.
[79] Odeh, A. M., and Battaineh, H. T. (2002) Causes of construction delay: traditional contracts. International journal of project management 20, 67-73.
[80] Tafazzoli, M., and Shrestha, P. P. (2017) Investigating Causes of Delay in US Construction Projects.
[81] Arantes, A., da Silva, P. F., and Ferreira, L. M. D. (2015) Delays in construction projects-causes and impacts. In 2015 International Conference on Industrial Engineering and Systems Management (IESM) pp. 1105-1110, IEEE.
[82] Srdić, A., and Šelih, J. (2015) Delays in construction projects: causes and mitigation. Organization, technology & management in construction: an international journal 7, 1383-1389.
[83] Gündüz, M., Nielsen, Y., and Özdemir, M. (2013) Quantification of delay factors using the relative importance index method for construction projects in Turkey. Journal of management in engineering 29, 133-139.
[84] González, P., González, V., Molenaar, K., and Orozco, F. (2014) Analysis of causes of delay and time performance in construction projects. Journal of Construction Engineering and Management 140, 04013027.
[85] Vacanas, Y., and Danezis, C. (2021) An overview of the risk of delay in Cyprus construction industry. International Journal of Construction Management 21, 369-381.
[86] Al‐Kharashi, A., and Skitmore, M. (2009) Causes of delays in Saudi Arabian public sector construction projects. Construction management and economics 27, 3-23.
[87] Arditi, D., Akan, G. T., and Gurdamar, S. (1985) Reasons for delays in public projects in Turkey. Construction management and economics 3, 171-181.
[88] Dlakwa, M., and Culpin, M. (1990) Reasons for overrun in public sector construction projects in Nigeria. International journal of project management 8, 237-241.
[89] Elinwa, A. U., and Joshua, M. (2001) Time-overrun factors in Nigerian construction industry. Journal of Construction Engineering and Management 127, 419-425.
[90] Mehrabi Sharafabadi, H., and Movafaghpour, M. A. (2022) Investigating causes of delay in natural gas distribution pipeline projects: a correlation analysis (case study: Khuzestan Province of Iran). Journal of applied research on industrial engineering 9, 68-77.
[91] Zhang, L., and Huo, X. (2015) The impact of interpersonal conflict on construction project performance: A moderated mediation study from China. International Journal of Conflict Management 26, 479-498.
[92] Park, C., and Jung, C. (2015) Empirical study on public conflict typology for social overhead capital. Korea Assoc. Policy Anal. Eval. 25, 71-104.
[93] Yates, D., and Hardcastle, C. (2003) The causes of conflict and disputes in the Hong Kong construction industry: a transaction cost economics perspective, RICS Foundation.
[94] Maiti, S., and Choi, J.-h. (2021) Investigation and implementation of conflict management strategies to minimize conflicts in the construction industry. International Journal of Construction Management 21, 337-352.
[95] Li, T. H., Ng, S. T., and Skitmore, M. (2012) Conflict or consensus: An investigation of stakeholder concerns during the participation process of major infrastructure and construction projects in Hong Kong. Habitat international 36, 333-342.
[96] Ntiyakunze, S. K. (2011) Conflicts in Building Projets in Tanzania: Analysis of Causes and Management Approaches. KTH Royal Institute of Technology.
[97] Behfar, K. J., Peterson, R. S., Mannix, E. A., and Trochim, W. M. (2008) The critical role of conflict resolution in teams: A close look at the links between conflict type, conflict management strategies, and team outcomes. Journal of applied psychology 93, 170.
[98] Diekmann, J. E., and Girard, M. J. (1995) Are contract disputes predictable? Journal of Construction Engineering and Management 121, 355-363.
[99] Hewitt, R. (1991) Winning contract disputes: Strategic planning for major litigation, Ernst & Young
[100] Sykes, J. (1996) Claims and disputes in construction. Construction Law Journal 12, 3-13.
[101] Bristow, D. I., and Vasilopoulos, R. (1995) The new CCDC 2: facilitating dispute resolution of construction projects. Construction Law Journal 11, 95-95.
[102] Conlin, J., Langford, D., and Kennedy, P. (2002) The relationship between construction procurement strategies and construction contract disputes. In The Organization and Management of Construction pp. 360-371, Routledge
[103] Cakmak, E., and Cakmak, P. I. (2014) An analysis of causes of disputes in the construction industry using analytical network process. Procedia-Social and Behavioral Sciences 109, 183-187.
[104] Ruqaishi, M., and Bashir, H. A. (2015) Causes of delay in construction projects in the oil and gas industry in the gulf cooperation council countries: a case study. Journal of management in engineering 31, 05014017.
[105] Bin Seddeeq, A., Assaf, S., Abdallah, A., and Hassanain, M. A. (2019) Time and cost overrun in the Saudi Arabian oil and gas construction industry. Buildings 9, 41.
[106] Wu, G., Liu, C., Zhao, X., and Zuo, J. (2017) Investigating the relationship between communication-conflict interaction and project success among construction project teams. International journal of project management 35, 1466-1482.
[107] Khahro, S. H., and Ali, T. H. (2014) Causes leading to conflicts in construction projects: A viewpoint of Pakistani construction industry. In International Conference on challenges in IT, Engineering and Technology (ICCIET’2014) July pp. 17-18.
[108] Elmagdobi, E., Čulić, N., Beljaković, D., Milajić, A., and Pejičić, G. (2016) Common causes of conflicts in construction projects–comparative analysis of projects in Libya and Serbia.
[109] Sweis, R., Moarefi, A., Hoseini-Amiri, S.-M., and Moarefi, S. (2019) Delay factors of the schedule of strategic industrial projects. International Journal of Building Pathology and Adaptation 37, 69-86.
[110] Mohammed, R. M., and Suliman, S. M. (2019) Delay in pipeline construction projects in the oil and gas industry: part 1 (risk mapping of delay factors). Int. J. Constr. Eng. Manag 8, 24-35.
[111] Sperandio Milan, G., Dorion, E., and da Rosa Matos, J. A. (2012) Distribution channel conflict management: a Brazilian experience. Benchmarking: An International Journal 19, 32-51.
[112] Akhtar, M. (2020) Dealing with EPC Project Management Problems and Challenges A Case Study on Petrochemical, Oil and Gas EPC Projects in Middle-East. In Abu Dhabi International Petroleum Exhibition and Conference p. D031S084R001, SPE.
[113] Alhajri, A., and Alshaibani, A. (2018) Causes of construction delay in petrochemical projects in KSA.
[114] Daryaii, S. B. (2023) Causes of Delays in Construction Projects: A Case Study for Petrochemical Industry of Iran. International Journal of Mechanical and Industrial Engineering 17, 21-27.
[115] Cheung, S. O., Ng, S. T., Lam, K. C., and Sin, W. S. (2001) A fuzzy sets model for construction dispute evaluation. Construction Innovation 1, 117-127.
[116] Carmichael, D. G. (2002) Disputes and international projects, CRC Press.
[117] Pourrostam, T., and Ismail, A. (2011) Significant factors causing and effects of delay in Iranian construction projects. Australian Journal of Basic and Applied Sciences 5, 450-456.
[118] Santoso, D. S., and Soeng, S. (2016) Analyzing delays of road construction projects in Cambodia: Causes and effects. Journal of management in engineering 32, 05016020.
[119] Fanousse, M. I. (2017) Causes of Delay in Construction Projects in Oil and Gas Construction Industry. The British University in Dubai.
[120] Shrivas, A., and Singla, H. K. (2022) Analysis of interaction among the factors affecting delay in construction projects using interpretive structural modelling approach. International Journal of Construction Management 22, 1455-1463.
[121] Khedri, A., and Moharrami, M. (2022) Determining and prioritizing the causes of delays in infrastructure projects in the petrochemical industry using hierarchical analysis. Civil and Project 4, 30-37.
[122] Shash, A. A., and AbuAlnaja, F. M. (2023) Causes of material delays in capital projects in Saudi Arabia. International Journal of Construction Management 23, 1109-1117.
[123] Naimi, M. (2013) Contract and Claim Prevention in Major Projects: a Study on Petrochemical Projects in Iran, The University of Manchester (United Kingdom).
[124] Jahangoshai Rezaee, M., Yousefi, S., and Chakrabortty, R. K. (2021) Analysing causal relationships between delay factors in construction projects: A case study of Iran. International Journal of Managing Projects in Business 14, 412-444.
[125] Farahani, A. F., Ahadmotlaghi, E., Farahani, A. F., and Valafar, A. (2015) Pathology the Causes of Delay in the Major Project’s of Oil Industrial, Case Study: South Pars. Research Journal of Recent Sciences ISSN 2277, 2502
[126] Behboud, R., Zarei, A., Azar, A., and Ebrahimi, S. A. (2023) Failure to develop the world's largest natural gas field: Lessons from endeavors in the South Pars mega projects. Energy 272, 127091.
[127] HoushmandRad, M. H., and Ghezelbeigloo, K. (2022) Identifying and ranking the causes of delays in different phases of oil industry projects in EPC contracts using TOPSIS method. In The Second International Conference on Research Findings in Civil Engineering, Architecture and Urban Planning.
[128] Alrasheed, K., Soliman, E., and Albader, H. (2023) Systematic review of construction project delays in Kuwait. Journal of Engineering Research 11, 347-355.
[129] Jalilizada, Mehraban, and Nadershahi, Mohaddeseh, (2023), "Diagnosing the Causes of Delays in Industrial Project Activities (Case Study: Eslamabad Gharb Petrochemical)" The 9th International Conference on Industrial and Systems Engineering, Mashhad. https://civilica.com/doc/1772819
[130] ProofHub, (2024). 7 Project management conflicts & ways to solve them. [online] Available at: https://www.proofhub.com/articles/project-management-conflicts [12 Nov. 2024].
[131] Pitagorsky, George. (2012) "Managing conflict in projects: Applying mindfulness and analysis for optimal results." Project Management Institute.
[132] Goodarzi, H., Ehsanifar, M., Mirhosseini, and S., mazaheri, H. (2024) Delay Management of Construction Projects with a Structural-Dynamic Hybrid Approach in Iran. Journal of Structural and Construction Engineering, doi: 10.22065/jsce.2024.453646.3395
[133] Alipouri, Y., and Taheri Duraki, S. A. (2022) Identifying the influential components of organizational managers' behavior on reducing claims in construction projects. Journal of Structural and Construction Engineering, 9(5): 213-194. doi: 10.22065/jsce.2021.281304.2423
[134] Durdyev, S., and Hosseini, M. R. (2020). Causes of delays on construction projects: a comprehensive list. International journal of managing projects in business, 13(1), 20-46.
[135] Chen, Y. Q., Zhang, Y. B., and Zhang, S. J. (2014). Impacts of different types of owner-contractor conflict on cost performance in construction projects. Journal of Construction Engineering and Management, 140(6), 04014017.
[136] Abou-ElFetouh, E., Abdel-Hamid, M., and Hasanin, S. (2024). Analysis of the Contractual Causes of Conflicts in Egyption Construction Projects. Journal of Al-Azhar University Engineering Sector, 19(72), 86-101.
[137] Tariq, J., and Gardezi, S. S. S. (2023). Study the delays and conflicts for construction projects and their mutual relationship: A review. Ain Shams Engineering Journal, 14(1), 101815.
[138] Farah, A. A., Osman, Y. H., Mohamud, F. A., Abdullahi, K. A., and Hassan, A. M. (2023, November). Assessment of the Factors Influencing Delays on Construction Projects in Mogadishu Somalia. In 2023 2nd International Conference on Multidisciplinary Engineering and Applied Science (ICMEAS) (pp. 1-6). IEEE.
[139] Loosemore, M., Nguyen, B. T., and Denis, N. (2000). An investigation into the merits of encouraging conflict in the construction industry. Construction Management & Economics, 18(4), 447-456.