[1] M. A. Kashef Haghighi, A. H. Mohebi far, and M. Sadeghi, “Construction Participation Contract: A Traditional Representation of Relationship-Based Approaches,” 2015.
[2] S. Mottaghi and A. Naser Asadi, “Examining different methods of situational analysis in strategy evaluation,” 2016.
[3] A. Ardeshir and H. Maleki tabar, Managing Risk in Construction Projects. Tehran: Amirkabir University of Technology, 2017.
[4] A. Hazeghi rad, “Strategic planning of research and technology in the Iranian higher education system: A case study of Urmia University,” Urmia University of Technology, 2014.
[5] S. Taleb Hashemi, “Comparative study of housing architecture criteria in Tehran and other similar cities in the world; Case study: Design of Elahieh residential complex,” Tarbiat Modares University, 2014.
[6] M. Falamarzi, “Investigating the fields of public-private partnership in the implementation of the country’s infrastructure projects using SWOT analysis and developing general contractual models,” Tehran University, 2009.
[7] H. Kheyrayi and H. Shariatmadar, “Study and evaluation of investment status and private sector participation in the field of construction industry in the manner of participation in construction Case study: Municipal organization in metropolitan areas,” 2015.
[8] A. Nazari and T. Salari, “Evaluation of the use of design and construction (D.B) contracts in construction projects using the SWOT matrix method,” 2016.
[9] M. Karbalaie Karimi, Collection of technical and legal points of the contracts for participation in the construction of the building. Tehran: Goutenberg, 2019.
[10] A. Hashemi, “Analysis of BOT Contracts from the Perspective of SWOT Method Performance Improvement: A Case Study of Iranian Infrastructure Projects,” 2018.
[11] H. Adnan, M. N. Rahmat, N. F. N. Mazali, and K. Jusoff, “Risk management assessment for partnering projects in the Malaysian construction industry,” J. Pol. L., vol. 1, p. 76, 2008.
[12] J. H. L. Chan, D. W. M. Chan, P. T. I. Lam, and A. P. C. Chan, “Preferred risk allocation in target cost contracts in construction,” Facilities, 2011.
[13] M. Chavidrouzi and M. Haghighi Khamami, “Identifying and prioritizing the risks of civil partnership contracts in urban construction,” 2015.
[14] M. Z. Ghareeb, “Risk Assessment in Turnkey Contracts and Its Impacts on Construction Project in Egypt,” Int. J. Innov. Res. Sci. Eng. Technol., vol. 7, no. 9, 2018.
[15] F. Arabi Moghaddam and J. Alamatian, “Risk assessment and management of design and construction contracts (non-industrial EPC) in road construction projects,” 2017.
[16] E. Osipova, “The impact of contractual and collaboration forms on risk management in Swedish construction projects,” in International Conference: World of Construction Project Management: 24/10/2007-26/10/2007, 2007, pp. 1–13.
[17] S. F. Sajedi, “Risk Assessment of General Conditions of Contract in Three-Factor Contracts, Case Study: Ahwaz Sewerage Projects,” The Islamic Azad University, Ahvaz Branch, 2016.
[18] S. Iqbal, R. M. Choudhry, K. Holschemacher, A. Ali, and J. Tamošaitienė, “Risk management in construction projects,” Technol. Econ. Dev. Econ., vol. 21, no. 1, pp. 65–78, 2015.
[19] H. Naderi and R. Parvaneh khah Tehran, “Prioritization and presentation of solutions to reduce the incidence of discrepancies in construction participation contracts by AHP method,” 2016.