[1] Nadimi, N., Shahbazi, H., gheibi, A., zare mirhosseini, A. (2019). 'Presenting a model to determine the method and priority of maintenance for flexible pavements by Fuzzy Inference System- Case study: Fars County', Quarterly Journal of Transportation Engineering, 10(3), pp. 459-481.
[2] Javadian, S., aminnejad, B., Lork, A. Determining the critical status of bridges for allocating the repair and maintenance using hybrid fuzzy multi-criteria decision-making methods (Case study: Tehran urban overpass bridges). Journal of Structural and Construction Engineering, 2022; 9(10): 152-174. doi: 10.22065/jsce.2022.315155.2642
[3] Behbahani, H., Nadimi, N., Khaleghi, M. Introducing a New Method for the Pavements’ Maintenance and Rehabilitation Planning. Amirkabir Journal of Civil Engineering, 2021; 53(7): 2801-2820. doi: 10.22060/ceej.2020.17506.6585
[4] Zolfegharifar, S. Y., Shanbedi, N. Investigating and Prioritizing Factors Affecting the Useful Service Life of Suburban Road Pavements with a Fuzzy Hierarchical Approach (Case Study: Shiraz- Ghaemieh Road). Road, 2023; 31(117): 107-118. doi: 10.22034/road.2023.375216.2126
[5] Haas, R., Hudson, W. and Zaniewski, J. (1994) Modern Pavement Management. vol 1, Krieger Publishing Company, Malabar, FL: Krieger Publishing Company.
[6] Fakhri, M., Alaleh, M., Edrisi, A. Pavement Maintenance and Rehabilitation Optimization Model by Considering User Costs for Iran. Quarterly Journal of Transportation Engineering, 2016; 7(3): 523-540.
[7] Saud A. Sultan, Zhongyin Guo, Evaluating life cycle costs of perpetual pavements in China using operational pavement management system, International Journal of Transportation Science and Technology, Volume 5, Issue 2, 2016, Pages 103-109, ISSN 2046-0430, https://doi.org/10.1016/j.ijtst.2016.09.007.
[8] Koks, E. E., Rozenberg, J., Zorn, C., Tariverdi, M., Vousdoukas, M., Fraser, S. A., & Hallegatte, S. (2019). A global multi-hazard risk analysis of road and railway infrastructure assets. Nature communications, 10(1), 1-11.
[9] Silva, R. J. Simoes, F. & Ferreira, A. (2022), Mechanical-Empirical Pavement Design Guide Applied to Portuguese Pavement Structures, Appl. Sci. 2022, 12(11), 5656. doi.org/10.3390/app12115656
[10] Shi, H., & Zeng, J. (2016). "Real-time prediction of remaining useful life and preventive opportunistic maintenance strategy for multi-component systems considering stochastic dependence". Computers & Industrial Engineering, 93, 192-204.
[11] Hosseini Firouz, M., & Ghadimi, N. (2016). "Optimal preventive maintenance policy for electric power distribution systems based on the fuzzy AHP methods", Complexity. 21(6), 70-88.
[12] Chootinan, Piya et al., (2006). A multi-year pavement maintenance program using a stochastic simulation-based genetic algorithm approach, Transportation research Part A 40 725-743.
[13] Gauri, R. Mahajan, B. Radhika & Krishna Prapoorna Biligiri. (2022), A critical review of vehicle-pavement interaction mechanism in evaluating flexible pavement performance characteristics, Road Materials and Pavement Design, Vol. 23- Issue 4
[14] Jafari, M., Janzadeh, H., Divandari, H.(2018), Prioritization of Road Pavement Repairing and Maintenance Options with Budget Constraint Approach (Case Study: Kelarabad-Abbasabad Road). Road, 26(95): 1-11.
[15] Ouma, Yashon, Opudo, J. ,Nyambenya, S. – 2015, Comparison of Fuzzy AHP and Fuzzy TOPSIS for Road Pavement Maintenance Prioritization: Methodological Exposition and Case Study , 2015, doi:10.1155/2015/140189, advances in Civil Engineering.
[16] Nautiyal A, Sharma S. Scientific approach using AHP to prioritize low volume rural roads for pavement maintenance. Journal of Quality in Maintenance Engineering] 2021; Available from: https://www.emerald.com/insight/content/doi/10.1108/JQME-12-2019-0111/full/html.
[17] Tun, N., Kyaing, K., & Aye, M. T. T. (2024). An Analytical Hierarchy Process (AHP) Approach to Road Maintenance Prioritization: A Case Study in Shan State, Myanmar. Innovation in Engineering, 1(2), 60–72. https://doi.org/10.58712/ie.v1i2.9.
[18] Mohajeri B.G., Pourrostam, R. , Sharifloo M., Majrouhi S. J., Safa, E. (2020) Reviewing Causes of Delay From the Risk Management Perspective in Execution Stage in Road Construction Projects (Case Study: Garmsar-Simin Dasht Road). Civil Infrastructure Researches; 5(2): 69-82. doi: 10.22091/cer.2020.5274.1196
[19] Saaty, T, L., Vargas L. and Cahyono St, 2022, The Analytic Hierarchy Process. Springer ISBN: 978-1-4614-3597-6.