[1] Ngacho, C. and Das, D, (2014), A performance evaluation framework of development projects: An empirical study of constituency development fund (CDF) construction projects in Kenya", International Journal of Project Management, 32(3), pp- 492-507.
[2] Albtoush, A.M.F., Doh, S.I., Rahman, R.A. et al. (2022) Critical success factors of construction projects in Jordan: an empirical investigation. Asian J Civ Eng 23, 1087–1099. https://doi.org/10.1007/s42107-022-00470-8
[3] Liang Guo, Yaoxiang Yu, Andongzhe Duan, Hongli Gao, Jiangquan Zhang, (2022) An unsupervised feature learning based health indicator construction method for performance assessment of machines, Mechanical Systems and Signal Processing, Volume 167, Part B, 108573,
[4] Hadi Sarvari, Daniel W.M. Chan, Ali Khalid Fakhir Alaeos, Timothy O. Olawumi, Alaa Abdalkarim Abdalridah Aldaud, (2021) Critical success factors for managing construction small and medium-sized enterprises in developing countries of Middle East: Evidence from Iranian construction enterprises, Journal of Building Engineering, Volume 43, 103152,
[5] Amin Akhavan Tabassi, A.H. Abu Bakar, (2009) Training, motivation, and performance: The case of human resource management in construction projects in Mashhad, Iran, International Journal of Project Management, Volume 27, Issue 5, Pages 471-480,
[7] Toor, Shamas-ur-Rehman & Ogunlana O.Stephen, (2010) "Beyond the ‘iron triangle’: Stakeholder perception of key performance indicators (KPIs) for large-scale public sector development projects", International Journal of Project Management, Volume 28, Issue 3, Pages 228-236.
[8] Fleming, Q. W, and Koppelman, J. M, (2016), December. Earned value project management. Project Management Institute.
[9] Wihlborg M., Sörensen J., Alkan Olsson J. (2019) Assessment of barriers and drivers for implementation of blue-green solutions in Swedish municipalities, Journal of Environmental Management, V233, 706-718.
[10] Haseli, B., & Hasan Ebdali, E. (2022). Ranking of Project Delay Factors in the Construction of Civil Infrastructure, Case study: Tehran Highway Bridge. New Approaches in Civil Engineering, 5(4), 1-13. doi: 10.30469/jnace.2022.150298
[11] Vihinen, M, (2012), How to Evaluate Performance of Prediction Methods? Measures and their Interpretation in Variation Effect Analysis. BMC Genomics.
[12] Banik. A and Sengupta. A, (2021) "Scope, Challenges, Opportunities and Future Goal Assessment of Floating Solar Park," 2021 Innovations in Energy Management and Renewable Resources (52042), pp. 1-5, doi: 10.1109/IEMRE52042.2021.9386735.
[13] Kaplan, R. S., & Norton, D. P. (1992). The balance scorecard – measures that drive performance. Harvard Business Review, 70(1), 71–79
[14] mirmezhad S A, Seyyedi S H, Yousefi hanoomarvar (2020) A. Developing a Performance Evaluation System Based on the BSC, ANP and Games Theory. ORMR, 9 (3) :133-150
[15] Anand, M., Sahay, B. S., & Saha, S. (2005). Balanced Scorecard in Indian Companies. Vikalpa, 30(2), 11–26. https://doi.org/10.1177/0256090920050202
[16] Ferreira, L.M.D.F., Silva, C. and Azevedo, S.G. (2016), "An environmental balanced scorecard for supply chain performance measurement (Env_BSC_4_SCPM)", Benchmarking: An International Journal, Vol. 23 No. 6, pp. 1398-1422. https://doi.org/10.1108/BIJ-08-2013-0087
[17] Yousefi Hanoomarvar A, Seyedi S H, Rofoogarzade M, Arasteh K. (2022) A Model for Developing the Best Strategy Combination Based on Balanced Scorecard, Fuzzy Net Present Value and Game Theory. JOR19 (1) :81-97
[18] Seyyedi, S. H., Amiri, M., & Yousefi Hanoomarvar, A. (2016). Designing a framework for determining the optimal strategy combination on SWOT analysis by fuzzy net present value and game theory. Industrial Management Journal, 8(3), 405-422. doi: 10.22059/imj.2016.61713
[19] Ming-Tsang Lu, Chao-Che Hsu, James J.H. Liou, Huai-Wei Lo, (2018) A hybrid MCDM and sustainability-balanced scorecard model to establish sustainable performance evaluation for international airports, Journal of Air Transport Management, Volume 71, Pages 9-19.
[20] Kittiya Yongvanich, James Guthrie, (2009), balanced scorecard practices amongst that companies: performance effects. Pacific Accounting Review, 21 (2), 132- 149.
[21] Satish Kumar Viswanathan, Kamalendra Kumar Tripathi & Kumar Neeraj Jha (2019) Influence of risk mitigation measures on international construction project success criteria – a survey of Indian experiences, Construction Management and Economics, DOI:10.1080/01446193.2019.1577987
[22] Takim, R and Akintoye, A (2002) Performance indicators for successful construction project performance. In: Greenwood, D (Ed.), 18th Annual ARCOM Conference, 2-4 September 2002, university of Northumbria. Association of Researchers in Construction Management, Vol. 2, 545-55.
[23] Chan, A.P.C. and Chan, A.P.L. (2004), "Key performance indicators for measuring construction success", Benchmarking: An International Journal, Vol. 11 No. 2, pp. 203-221. https://doi.org/10.1108/14635770410532624
[24] Izabela Andressa Machado dos Santos; Gladys Dorotea Cacsire Barriga; Daniel Jugend; Paulo Augusto Cauchick-Miguel (2019) Organizational factors influencing project success: an assessment in the automotive industry, Production, vol.29, pp1-13
[25] Husam Mansour, Eeydzah Aminudin, Balqis Omar & Ali Al-Sarayreh (2022) Development of an impact-on-performance index (IPI) for construction projects in Malaysia: a Delphi study, International Journal of Construction Management, 22:11, 2003-2012, DOI: 10.1080/15623599.2020.1762036
[26] Cha, H.S., Kim, C.K. (2011) Quantitative approach for project performance measurement on building construction in South Korea. KSCE J Civ Eng 15, 1319–1328. https://doi.org/10.1007/s12205-011-1323-5
[27] Prachi Vinod Ingle & Gangadhar Mahesh (2020): Construction project performance areas for Indian construction projects, International Journal of Construction Management, DOI: 10.1080/15623599.2020.1721177
[28] Mcleod, L., Doolin, B., & Macdonell, S. G. (2012). A Perspective-Based Understanding Of Project Success. Project Management Journal, 43, 68-86.
[29] Frefer AA, Mahmoud M, Haleema H, Almamlook R (2018) Overview Success Criteria and Critical Success Factors in Project Management. Ind Eng Manage 7: 244. doi:10.4172/2169-0316.1000244
[30] Barry, B., Braun, J. and Derocchi, M., (2010), Development and Evaluation of a Decision Model for Approval of Civil Engineering Independent Study Projects. In American Society forEngineering Education. American Society for Engineering Education.
[31] Solanki Arpit, Sarkar Debasis & Kapdi Parth (2022) Evaluation of key performance indicators of Internet of Things and Cloud Computing for infrastructure projects in Gujarat, India through Consistent Fuzzy Preference Relations approach, International Journal of Construction Management, DOI: 10.1080/15623599.2022.2114060
[32] Bapat Hirakraj, Sarkar Debasis & Gujar Rajesh (2023) Application of multi-criteria decision making for evaluation of key performance indicators of integrated project delivery and BIM model for an infrastructure transportation project in Western India, International Journal of Construction Management, 23:12, 2077-2086, DOI: 10.1080/15623599.2022.2040077
[33] Madushika, W. H. S., Perera, B. A. K. S., Ekanayake, B. J. & Shen, G. Q. P. (2020) Key performance indicators of value management in the Sri Lankan construction industry, International Journal of Construction Management, 20:2, 157-168, DOI: 10.1080/15623599.2018.1484556
[34] Hemanata., D, Anil sawhney, K.C. Iyer & S. Rentala.,(2012), Analysing factors affecting delays in Indian construction projects”. International journal of project management. VOL.30,PP.479-489.
[35] Van Tam, N., Quoc Toan, N., Phong, V.V. and Durdyev, S. (2023), "Impact of BIM-related factors affecting construction project performance", International Journal of Building Pathology and Adaptation, Vol. 41 No. 2, pp. 454-475. https://doi.org/10.1108/IJBPA-05-2021-0068
[36] Nethathe, J. M., Van Waveren, C. C., & Chan, K. Y. (2011). Extended critical success factor model for management of multiple projects: An empirical view from Transnet in South Africa. South African Journal Of Industrial Engineering, 22(2), 189-203.
[37] Adafin, J., Rotimi, J.O.B. and Wilkinson, S. (2021), "An evaluation of risk factors impacting project budget performance in New Zealand", Journal of Engineering, Design and Technology, Vol. 19 No. 1, pp. 41-61. https://doi.org/10.1108/JEDT-03-2019-0056
[38] Jian Zuo, Xianbo Zhao, Quan Bui Minh Nguyen, Tony Ma, Shang Gao, (2016)"Soft skills of construction project management professionals and project success factors: a structural equation model", Engineering, Construction and Architectural Management, https://doi.org/10.1108/ECAM-01-2016-0016
[39] Kassem, M., Khoiry, M.A. and Hamzah, N. (2020), "Assessment of the effect of external risk factors on the success of an oil and gas construction project", Engineering, Construction and Architectural Management, Vol. 27 No. 9, pp. 2767-2793. https://doi.org/10.1108/ECAM-10-2019-0573
[40] Shakeri, Hedieh. Khalilzadeh, Mohammad (2020) Analysis of factors affecting project communications with a hybrid DEMATEL-ISM approach (A case study in Iran), Heliyon,Volume 6, Issue 8, ISSN 2405-8440, https://doi.org/10.1016/j.heliyon.2020.e04430.
[41] Jitpaiboon, T., Smith, S. M., & Gu, Q. (2019). Critical Success Factors Affecting Project Performance: An Analysis of Tools, Practices, and Managerial Support. Project Management Journal, 50, 271–287.
[42] Iqbal, Syed Muhammad Javed; Zaman, Umer; Siddiqui, Suleman Hafeez; Imran, Muhammad Kashif (2019) Influence of transformational leadership factors on project success, Pakistan Journal of Commerce and Social Sciences (PJCSS), ISSN 2309-8619, Johar Education Society, Pakistan (JESPK), Lahore, Vol. 13, Iss. 1, pp. 231-256
[43] Vittal S. Anantatmula & Parviz F. Rad (2018) Role of Organizational Project Management Maturity Factors on Project Success, Engineering Management Journal, 30:3, 165-178, DOI: 10.1080/10429247.2018.1458208
[44] Matthews, J., Stanley, T. and Davidson, P. (2018), "Human factors and project challenges influencing employee engagement in a project-based organisation (PBO)", International Journal of Managing Projects in Business, Vol. 11 No. 4, pp. 873-885. https://doi.org/10.1108/IJMPB-04-2017-0043
[45] Vahabi Ali, Nasirzadeh Farnad & Mills Anthony (2022) Impact of project briefing clarity on construction project performance, International Journal of Construction Management, 22:13, 2504-2516, DOI: 10.1080/15623599.2020.1802681
[46] Irfan, M., Khalid, R.A., Kaka Khel, S.S.U.H., Maqsoom, A. and Sherani, I.K. (2023), "Impact of work–life balance with the role of organizational support and job burnout on project performance", Engineering, Construction and Architectural Management, Vol. 30 No. 1, pp. 154-171. https://doi.org/10.1108/ECAM-04-2021-0316
[47] Gomes, Jorge. Romão, Mário. (2016) Improving Project Success: A Case Study Using Benefits and Project Management, Procedia Computer Science, Volume 100, Pages 489-497.
[48] Ahmadabadi Akbari, Heravi Ali, Gholamreza, (2019) The effect of critical success factors on project success in Public-Private Partnership projects: A case study of highway projects in Iran, Transport Policy, Volume 73, 2019, Pages 152-161, ISSN 0967-070X, https://doi.org/10.1016/j.tranpol.2018.07.004.
[49] Cheng, C.H. & Lin, Y, (2002), evaluating the best main battle tank using fuzzy decision theory with linguistic criteria evaluation. European Journal of Operational Research, 142, pp- 174-186.
[50] Abolhabib, Mohammad, Sharifi, Farzad, Rahimzadeh Dehaghani, Amir (2020) A hesitant fuzzy DANP for Identifying and prioritizing effects and challenges of green roof on mental health in developing countries Correspondence, Journal of Advanced Pharmacy Education & Research, V.10, Iss.1, 125-136
[51] Opricovic, S., (1998), Multi-criteria Optimization of Civil Engineering Systems. Faculty of Civil Engineering, Belgrade.
[52] Bazzazi.A, Bazzazi.M, Karimi.B, (2011), Deriving preference order of open pit mines equipment through MADM methods: Application of modified VIKOR method, Department of Mining and Metallurgical Engineering, Amirkabir University of Technology, Tehran, Iran.
[53] Opricovic, S. (2011) Fuzzy VIKOR with an application to water resources planning, Expert Systems with Applications, 38, 12983–12990
[54] Bodea, Constanta-Nicoleta & Dascalu, Maria. (2012). Designing an Innovative Training Tool: A Formative E-Assessment System for Project Management. 10.5772/29465.
[55] Ika, L. A. (2009). Project Success as a Topic in Project Management Journals. Project Management Journal, 40(4), 6–19. https://doi.org/10.1002/pmj.20137
[56] Zarina Alias, E.M.A. Zawawi, Khalid Yusof, N.M. Aris, (2014) Determining Critical Success Factors of Project Management Practice: A Conceptual Framework, Procedia - Social and Behavioral Sciences, Volume 153, Pages 61-69.
[57] Alawamleh, Mohammad & Bani Ismail, Loay & Nahleh, Marwan & Qudah, Kamal. (2020). Role of open innovation in project management CSF. International Journal of Business Innovation and Research. V21. N4. 466-489. 466. 10.1504/IJBIR.2020.106013.
[58] Osorio, P, C, F. Quelhas, O, L, G. Zotes L, P. (2014). Critical Success Factors in Project Management: An Exploratory Study of an Energy Company in Brazil. Global Journal of Management and Business Research, 14(A10), 39–50.
[59] Zawawi, E.M.A. Kamaruzzaman, S.N., Z. Zulkarnain, Ithnin, S.H., (2011) A Conceptual Framework for Describing CSF of Building Maintenance Management, Procedia Engineering, Volume 20, Pages 110-117.
[60] Ahmad, Hesha, An, Min, (2008), Knowledge management implementation in construction projects: AKM model for Knowledge Creation, Collection and Updating (KCCU), Int. J. Project Organization and Management, Vol. 1, No. 2.
[61] Matilda, Alexandrova, & Lilyana, Ivanova-Stankova. (2013). Critical success factors of project management: empirical evidence from projects supported by eu programmes. 9th international asecu conference on “systemic economic crisis: current issues and perspectives”
[62] Martens, M, L. Carvalho, M. M. (2017) Key factors of sustainability in project management context: A survey exploring the project managers' perspective, International Journal of Project Management, Volume 35, Issue 6, Pages 1084-1102,
[63] Kiani Mavi, Reza. Standing, Craig. (2018) Critical success factors of sustainable project management in construction: A fuzzy DEMATEL-ANP approach, Journal of Cleaner Production, Volume 194, Pages 751-765.
[64] Banihashemi Saeed, Hosseini M. Reza, Golizadeh Hamed, Sankaran Shankar, (2017) Critical success factors (CSFs) for integration of sustainability into construction project management practices in developing countries, International Journal of Project Management, Volume 35, Issue 6, Pages 1103-1119.
[65] Gimenez, C. Sierra, V. Rodon, J. (2012) Sustainable operations: Their impact on the triple bottom line, International Journal of Production Economics, Volume 140, Issue 1, Pages 149-159.
[66] Yuanyuan Li, Huanbin Song, Peidong Sang, Po-Han Chen, Xingmin Liu, (2019) Review of Critical Success Factors (CSFs) for green building projects, Building and Environment, Volume 158, Pages 182-191.
[67]Fernández-Sánchez, Gonzalo. Rodríguez-López, Fernando (2010) A methodology to identify sustainability indicators in construction project management—Application to infrastructure projects in Spain, Ecological Indicators, Volume 10, Issue 6, Pages 1193-1201,
[68] Ihuah Paulinus Woka, Iyenemi Ibimina Kakulu, David Eaton, (2014) A review of Critical Project Management Success Factors (CPMSF) for sustainable social housing in Nigeria, International Journal of Sustainable Built Environment, Volume 3, Issue 1, Pages 62-71.
[69] Thomson, C., El-Haram, M. A., & Emmanuel, R. (2011). Mapping sustainability assessment with the project life cycle. Engineering Sustainability, 164(2), 143-157. https://doi.org/10.1680/ensu.2011.164.2.143
[70] Xing Y., Horner R.M.W., El-Haram M.A., Bebbington J. (2009) "A framework model for assessing sustainability impacts of urban development", In Accounting Forum ,Vol. 33, No. 3, pp. 209-224.
[71] Mulder, J. & Brent, A.C. (2006) Selection of Sustainable Rural Agriculture Projects in South Africa: Case Studies in the LandCare Programme, Journal of Sustainable Agriculture, 28:2, 55-84, DOI: 10.1300/J064v28n02_06