[1] Basu, P., Prezzi, M., and Basu, D. (2010). Drilled displacement piles: Current practice and design. DFI J., 4(1), 3–20.
[2] Eslami, A., Aflaki, E and Hosseini, B. (2011). Evaluating CPT and CPTu based pile bearing capacity estimation methods using Urmiyeh Lake Causeway pilling records. Scientica Iranica, 18(5): p. 1009-1019.
[3] Eslami, A. Fellenius, B.H. (1997). Pile capacity by direct CPT and CPTu methods applied to 102 case histories. Canadian Geotechnical Journal, 34(6):p.886-904.
[4] Van Impe, W. F., Viggiani, C., Van Impe, P. O., Russo, G., and Bottiau, M. (1998). Load settlement behaviour versus distinctive O-pile execution parameters. Proc., 2nd Int. Geotechnical Seminar Deep Foundation on Bored and Auger Piles–BAP III, A.A. Balkema, Amsterdam, Netherlands, 355–356.
[5] De Beer, E. (1988). Different behavior of bored and driven piles. In: Proceedings of the 1st international geotechnical seminar on deep foundations on bored and auger piles (BAP I), Rotterdam, Balkema, p. S.47–82.
[6] Peiffer, H, Van Impe W. (1993). Evaluation of pile performance based on soil stress measurements – field test program. In: Proceedings of the 2nd international geotechnical seminar on deep foundations on bored and auger piles (BAP II), Rotterdam, Balkema, p. S.385–89.
[7] NeSmith, W. M. (2002). Design and installation of pressure-grouted, drilled displacement piles. Proc., 9th Int. Conf. on Piling and Deep Foundations, Deep Foundations Institute, NJ, 561–567.
[8] Siegel, T. C., NeSmith, W. M., NeSmith, W. M., and Cargill, P. E. (2007). Ground improvement resulting from installation of drilled displacement piles. Proceedings of DFI’s 32nd annual conference on deep foundations, Colorado Springs, U.S.A., pp. 129-138.
[9] Bustamanate, M. and Gianeselli, L.,)1998(. Installation parameters and capacity of screwed piles. Deep Foundations on Bored and Auger Piles, BAP III, Balkema, Rotterdam, pp. 95-108.
[10] NeSmith, W. M., Member, P.E. (2002). Static capacity analysis of Augered, pressure injected displacement piles: Chief Geotechnical Engineer, Berkel & Company Contractors, Inc., P.O Box 335, Bonner Springs, Kansas 66012, and ASCE.
[11] Meng, Z, Chen, J, Zhang, M. (2015). Field tests to investigate the installation effects of drilled displacement piles with screw shaped shaft in clay. 10.1061/ (ASCE) GT.1943-5606.0001371. American Society of Civil Engineers.
[12] Peiffer, H. (2009). The dmt as tool for the monitoring of the effect of pile installation on the stress state in the soil. In: Proceedings of the 5th international geotechnical Seminar on Deep Foundations on bored and auger Piles (BAP V). Ghent: CRC Press, p. S.135–42.
[13] Sakr, M.,)2011(. Installation and performance characteristics of high capacity helical piles in cohesion less soils. Deep Found. (DFI)5(1),39–57.
[14] Park, S. Roberts, L. (2012). Design methodology for axially loaded auger cast-in-place and drilled displacement piles. DOI: 10.1061/ (ASCE) GT.1943-5606.0000727. American Society of Civil Engineers.
[15] Prezzi, M and Basu, P. (2005). Overview of construction and design of auger cast in place and drilled displacement piles. In DFI’s 30th annual conference on deep foundations. Chicago, U.S.A.
[16] Brown, D. A. (2005). Practical considerations in the selection and use of continuous flight auger and drilled displacement piles. Proc., Geo-Frontiers: Advances in Designing and Testing Deep Foundations, ASCE, Reston, VA, 251–261.
[17] Albuquerque, P., Carvalho, D and Massad, F. (2001). Bored continuous flight auger and omega instrumented piles: Behavior under compression. In the 16th international conference on soil mechanics and geotechnical engineering. Osaka, Japan.
[18] Pirrello, S. (2017). Design and construction validation of pile performance through high strain dynamic tests for both contiguous flight auger and drilled displacement piles. International Journal of Geotechnical and Geological Engineering, 11(9): p. 759-765.
[19]Tusha, C. D. H, Aoki, N., Rault, G., Thorel, L. and Garnier, J. (2012). Evaluation of the efficiencies of helical anchor plates in sand by centrifuge model tests, Canadian Geotechnical Journal, Vol. 49, No. 9, pp. 1102-1114.
[20] Weech, C. N., Eng. P, and Howie, J. A. (2012). Helical piles in soft sensitive soils- a field study of disturbance effects on pile capacity, VGS Symposium on Soft Ground Engineering.
[21] Moshfeghi, S and Eslami, A. (2018). Reliability based assessment of drilled displacement piles bearing capacity using CPT records. Marine Georesources and Geotechnology, p 1-14.
[22] Basou, P, Prezzi, M and Salgado, R. (2014). Modeling of installation and quantification of shaft resistance of drilled displacement piles in sand. International Journal of Geomechanics, 14(2): p. 214-229.
[23] O’Neil, M. (1994). Review of augered pile practice outside the United States. Journal of the Transportation Research Board, 1994. 1447: p. 3-9.
[24] Larisch, M. (2014). Behavior of stiff fine grained soil during the installation of screw auger displacement piles. The University of Queensland.
[25]Gwizdala, K, Pajak, M, (2008). Influence of installation of piles with partial and full displacement of the soil on the subsoil strength. Architecture Civil Engineering Enviroment, 1:p. 43-50.
[26]Zare, M. Eslami, A. (2014). Study of deep foundation performances by frustum confining vessel (FCV). International Journal of Civil Engineering, Vol. 12, No. 4, Transaction B: Geotechnical Engineering.
[27] Zarrabi, M. Eslami, A. (2016). Behavior of Piles under Different Installation Effects by Physical Modeling. Int. J. Geomech., 04016014.ASCE.
[28] Askari Fateh, A.M. Eslami, A. Fahimifar, A. (2016). Study of soil disturbance effect on bearing capacity of helical pile by experimental modelling in FCV. International Journal of Geotechnical Engineering.
[29] Livneh, B. and El Naggar, M.H. (2008), axial testing and numerical modeling of square shaft helical piles under compressive and tensile loading. Canadian Geotechnical Journal, 45(8): p.1142-1155.