[1]Gao, S. and S.P. Low, Lean Construction Management. 2014: Springer.
[2]Abbasian-Hosseini, S. A.. andNikakhtar, A.. andGhoddousi, P. (2014). Verification of lean construction benefits through simulation modeling: A case study of bricklaying process. KSCE Journal of Civil Engineering, 18(5), 1248-1260 .
[3]Ballard, H. G. (2000). The last planner system of production control. University of Birmingham .
[4]Tommelein, I. D. (1997). Models of lean construction processes: example of pipe-spool materials management.
[5]Al-Sudairi, A. A. (2007). Evaluating the effect of construction process characteristics to the applicability of lean principles. Construction Innovation, 7(1), 99-121 .
[6]Wang, P.. andMohamed, Y.. andAbourizk, S. M.. andRawa, A. T. (2009). Flow production of pipe spool fabrication: Simulation to support implementation of lean technique. Journal of Construction Engineering and Management, 135(10), 1027-1038 .
[7]Mao, X.. andZhang, X. (2008). Construction process reengineering by integrating lean principles and computer simulation techniques. Journal of Construction Engineering and Management, 134(5), 371-381 .
[8]Yang, G.. andXu, X.. andWang, Z.. andZhou, L. (2013). Vulnerability Analysis and Optimal Design of Lean Construction System ICCREM 2013: Construction and Operation in the Context of Sustainability (pp. 366-376.(
[9]Nikakhtar, A.. andHosseini, A. A.. andWong, K. Y.. andZavichi, A. (2015). Application of lean construction principles to reduce construction process waste using computer simulation: a case study. International Journal of Services and Operations Management, 20(4), 461-480 .
[10]Koskela, L. (1999). Management of production in construction: a theoretical view .
[11]Kim, D. (2002). Exploratory study of lean construction: Assessment of lean implementation .
[12]Koskela, L. (1992). Application of the new production philosophy to construction (Vol. 72): Stanford university Stanford, CA.
[13]Thomas, H. R.. andHorman, M. J.. andde Souza, U. E. L.. andZavřski, I. (2002). Reducing variability to improve performance as a lean construction principle. Journal of Construction Engineering and Management, 128(2), 144-154 .
[14] Love, P. E.. andSmith, J. (2003). Benchmarking, benchaction, and benchlearning: rework mitigation in projects. Journal of Management in Engineering, 19(4), 147-159 .
[15]Womack, J. P.. andJones, D. T.. andRoos, D. (1990). Machine that changed the world: Simon and Schuster.
[16]Farrar, J. M.. andAbouRizk, S. M.. andMao, X. (2004). Generic implementation of lean concepts in simulation models. Lean Construction Journal, 1(1), 1-23 .
[17]Hassan, M. M.. andGruber, S. (2008). Simulation of concrete paving operations on Interstate-74. Journal of Construction Engineering and Management, 134(1), 2-9 .