[1] Dhakal, RP. (2010). Damage to Non-structural Components and Contents in 2010 Darfi eld Earthquake. Bulletin of the New Zealand Society of Earthquake Engineering, 43, (4), 404−411.
[2] Priestley, MJN., Sritharan, S., Conley, JR., Pampanin, S. (1999). Preliminary results and conclusions from The PRESSS five-story precast concrete test building. PCI Journal, 44 ( 6), 42–67. DOI:10.15554/pcij.11011999.42.67.
[3] Federal Emergency Management Agency., (2011).FEMA E-74Reducing the Risks of Nonstructural Earthquake Damage A Practical Guide. Washington, D.C.
[4] Fulop, L.A. Dubina, D. (2004).Performance of wall-stud cold-formed shear panels under monotonic and cyclic loading, part II: numerical modelling and performance analysis. Thin-Walled Structures, 42, 339–349.https://doi.org/10.1016/S0263-8231(03)00064-8.
[5] Kanvinde, A.M.Deierlein, G.G. (2006). Analytical models forthe seismic performance of gypsum drywall partitions. Earthquake Spectra, 22, 391–411. https://doi.org/10.1193/1.2191927
[6] Restrepo, J.I. Lang, A.F. (2011). Study of loading protocols in light-gauge stud partition walls. Earthquake Spectra, 27, 1169–1185. https://doi.org/10.1193/1.3651608
[7] Kanvinde, A.M.Deierlein, G.G. (2006). Analytical models for the seismic performance of gypsum drywall partitions. Earth Spectra 22, 391–411. https://doi.org/10.1193/1.2191927
[8] Häupl, P. Fechner, H.Petzold, H. (2004). Interior retrofit of masonry wall to reduce energy and eliminate moisture damage: comparison of modeling and field performance. In: Thermal performance of the exterior envelopes of whole buildings IX. Atlanta: GA: ASHRAE, 1-12.
[9] Bertolini, M. Braglia, M. (2006). Application of the AHP methodology in making a proposal for a public work contract. 17 January. https://doi.org/10.1016/j.ijproman.2006.01.005 .
[10] Keeny, R.L.Raiffa, H. (1993). Decision making with multiple objectives: Preferences and value tradeoffs. Cambridge: Cambridge UniversityPress. https://doi.org/10.1017/CBO9781139174084 .
[11] Che-Wei, C. Cheng-Ru, W. Chin-Tsai, L.Huang-Chu, C. (2007). An application of AHP and sensitivity analysis for
selecting the best slicing machine. Computer and Industrial Engineering, 52 (2), 296-307. https://doi.org/10.1016/
j.cie.2006.11.006 .
[12] Kamal, M. Al-Subhi, A.H. (2001)Application of the AHP in project management.International Journal of project management, 19, 19-27. https://doi.org/10.1016/S0263-7863(99)00038-1
[13] Tiwari, M.K. Banerjee, R. (2001). A Decision Support System for the Selection of a Casting process using AHP. Production Planning and Control, 12, 689-694. https://doi.org/10.1080/09537280010016783
[14] Tabarak, M.A. William, D. (2003). Artificial neural network for selection of buildable structural systems. Engineering Construction and Architectural Management Journal, 10(4), 263-271. https://doi.org/10.1108/09699980310489979
[15] Wong, J. Li, H. Lai, J. (2008). Evaluating the system intelligence of the intelligent building systems. Automation in Construction, 17, 284-302. https://doi.org/10.1016/j.autcon.2007.06.002.
[16] Dağdeviren, M. (2008). Decision Making in Equipment Selection: an integrated approach with AHP and
PROMETHEE. Journal of Intelligent Manufacturing, 19, 397-406. https://doi.org/10.1007/s10845-008-0091-7.
[17] Y. M.W, Y.L. b and Z. Hua. (2008). On the extent analysis method for fuzzy AHP and its applications. European Journal of Operational Research, 186 (2), 735-747. https://doi.org/10.1016/j.ejor.2007.01.050
[18] Basak Sener, M Lutfi Suzen and V. Doyura. (2006). Landfill site selection by using geographic information system. Environmental Geology, 49 ( 3), 376-388.
[19] Al-Harbi, K.M.A.-S. (2001). Application of the AHP in project management. International Journal of Project Management, 19, 19- 27.
[20] Saaty, T.L. (1977). A scaling method for priorities in hierarchical structures. Journal of Mathematical Psychology, 15(3), 234-281. https://doi.org/10.1016/0022-2496(77)90033-5.
[21] Amiri, M.P. (2010). Project selection for oil-fields development by using the AHP and fuzzy TOPSIS methods. xpert Systems with Applications, 37 (9), 6218–6224. https://doi.org/10.1016/j.eswa.2010.02.103.
[22] Duen-Ren Liua and Y.-Y. Shih. (2005). Integrating AHP and data mining for product recommendation based on customer lifetime value, Information & Management, 42 (3), 387-400. https://doi.org/10.1016/j.im.2004.01.008.
[23] Semih Onut and S. Soner. (2011). Transshipment site selection using the AHP and TOPSIS approaches under fuzzy environment. Waste Management, 28(9), 1552-1559. https://doi.org/10.1016/j.wasman.2007.05.019.