[1]. Wang, H. L., Liu, Y., Jiang, Y., & Wang, Z. T. (2022). A novel approach for risk assessment of building damage via Metro tunnel construction. Advances in Civil Engineering, 2022(1), 8448223.
[2]. Biklari, A., (2017). Risk assessment and management in Karaj Metro Line 2 using project structure. Master's thesis in Civil Engineering, specialization: Construction Management, Alborz University. [In Persian]
[3]. Bazm Ara, A., (2021). Presenting a risk management model for metro tunnel construction using fuzzy logic. Master's thesis in civil engineering, orientation: engineering and construction management, supervised by Ali Ghorbani, Payam Noor University, Karaj Center. [In Persian]
[4]. Junjie, J., Wenhao, S., & Yuan, W. (2024). A risk assessment approach for road collapse along tunnels based on an improved entropy weight method and K-means cluster algorithm. Ain Shams Engineering Journal, 15(7), 102805.
[5]. Liu, K., Liu, Y., Kou, Y., Yang, X., & Hu, G. (2024). Efficiency of risk management for tunnel security of megaprojects construction in China based on system dynamics. Journal of Asian Architecture and Building Engineering, 23(2), 712-724.
[6]. Shaffiee Haghshenas, S., Shaffiee Haghshenas, S., Abduelrhman, M. A., Zare, S., & Mikaeil, R. (2022). Identifying and Ranking of Mechanized Tunneling Project's Risks by Using A Fuzzy Multi-Criteria Decision Making Technique. Journal of Soft Computing in Civil Engineering, 6(1), 29-45.
[7]. Qaraqanabadi, F., Sarkardeh, H., (2025). Identification and evaluation of supply chain risks in road construction projects. Journal of Structural and Construction Engineering, 12(02), e204507. [In Persian]
[8]. Zokaei, M., Abbasi, M., Vahidnia, M., Zarie, M., Zndsalimi, F., & Falahati, M., (2024). Developing a Model for Occupational Safety and Health Rrisk Assessment during the Construction Phase of a Metro Tunnel Using Internet of Things (IoT) Technology. J Health Saf Work, 14(3), 540-555. [In Persian]
[9]. Aslani, M., Salarvand, A., Hojjat Panah, Sh., Izadikhah, A., (2023). Risk Management of Design and Construction of Tehran Metro Stations, Sixth Annual Congress of Infrastructure Development Technology, Civil Engineering, Architecture and Urban Planning of Iran. [In Persian]
[10]. Shahraki, M. R. & Mesri, J. (2021). Risk Assessment and Prioritization of Construction Projects with a Mixed-Dimensional Approach and Network Analysis Process (Case Study: Sistan-Hamoun Plain 2 Water Supply Project). Journal of Structural and Construction Engineering, 8(Special Issue 3), 78-95. [In Persian]
[11]. Ahmadvand, M., Eghbali, H., (2022). Identifying and ranking types of risks in underground projects using the AHP method (applied example of Tehran Metro Line 7), Journal of Systems and Productivity Engineering, 1(1), 7-29. [In Persian]
[12]. Shahraki, M. R. & Vahedi nezhad, N. (2021). Management and Assessment of Tunnel Construction Projects risks Using Combinatorial Method of the VIKOR and Analytical Hierarchy process. Journal of Mining Engineering, 16(50), 39-57. [In Persian]
[13]. Akbari, A., Zare, S. & Ataei, M. (2020). Ranking the Risk of Mechanized Tunnel construction in Large Cross Section by Fuzzy Multi Criteria Decision Making Methods in Western Alborz Tunnel. Journal of Mineral Resources Engineering, 5(2), 43-65. [In Persian]
[14]. Tang, C., Shen, C., Zhang, J., & Guo, Z. (2024). Identification of Safety Risk Factors in Metro Shield Construction. Journal of Buildings, 14(2), 492.
[15]. Koohathongsumrit, N., & Meethom, W., (2024). Risk analysis in underground tunnel construction with tunnel boring machines using the Best–Worst Method and data envelopment analysis. Journal of Heliyon, 10, e23486.
[16]. Sun, H., Rui, Y., Lu, Y., Dai, Y., Wang, X., & Li, X., (2024). Construction risk probability assessment of shield tunneling projects in karst areas based on improved two-dimensional cloud model. Tunnelling and Underground Space Technology, 154, 106086.
[17]. Yang, Y., Wang, Y., Easa, S. M., & Yan, X. (2023). Risk factors influencing tunnel construction safety: Structural equation model approach. Journal of Heliyon, 9(1), 1-13.
[18]. Gogate, N. G., Shelake, A. G., & Band, P. (2024). Selection of most significant risk factors for Indian tunnel projects: an integrated fuzzy-based MCDM approach. International Journal of Construction Management, 24(2), 161-176.
[19]. Wang, Q., Xiong, Z., Zhu, K., & Guo, P. (2023). Construction safety risks of metro tunnels constructed by the mining method in Wuhan city, china: a structural equation model-fuzzy cognitive map hybrid method. Journal of Buildings, 13(5), 1335, 1-24.
[20]. Yaacob, N. A. S., Yahya, M. N., Samsudin, N. A., & Shoabani, S. N. (2023). A Study on Risk Assessment in Tunnelling Construction for Klang Valley Mass Rapid Transit (KVMRT) Putrajaya Line. Progress in Engineering Application and Technology, 4(2), 1203-1214.
[21]. Hwang, B. G., Zhao, X., & Yu, G. S. (2016). Risk identification and allocation in underground rail construction joint ventures: Contractors’ perspective. Civil Engineering and Management, 22(6), 758-767.
[22]. Orang, O., de Lima e Silva, P. C., & Guimarães, F. G. (2023). Time series forecasting using fuzzy cognitive maps: a survey. Artificial Intelligence Review, 56(8), 7733-7794.
[23]. Rodriguez-Repiso, L., Setchi, R., & Salmeron, J. L. (2007). Modelling IT projects success: Emerging methodologies reviewed. Journal of Technovation, 27(10), 582-594.
[24]. Abadi, F., Jamali, G., & Ghorbanpour, A. (2024). Intelligent Supply Chain Management under Internet of Things Technology with Fuzzy Cognitive Map Approach. Journal of Intelligent Business Management, 12(47), 45-77. [In Persian]
[25]. Salehi, M. & Hamehvand, M. (2016). A New Approach Based on Failure Mode and Effects Analysis and Kepland to Extract and Prioritize the Effective risks on Project Completion Time. Modiriat-e-farda, 15(1), 50-72. [In Persian]
[26]. Saeedy, A., Andalib, M. & kojoori haraj, J. (2018). Identifying Barriers to Nomadic Role in National Production by Right-Based Balance Approach. Economics and regional development, 25(15), 25-54. [In Persian]
[27]. Ghasemi, A. & Ghobadian, M. (2015). Drawing and rating scenarios of the future of Iran's power industry utilizes the fuzzy cognitive map and Scenario analysis. Journal of Technology Development Management, 3(1), 101-134. [In Persian]
[28]. Haghani, F., Shahraki, A. & Rahdar, M. (2024). Using the fuzzy cognitive map in designing a decision support system in diabetes insipidus. Innovation Management and Operational Strategies, 5(3), 331-347. [In Persian]
[29]. Özesmi, U., & Özesmi, S. L. (2004). Ecological models based on people’s knowledge: a multi-step fuzzy cognitive mapping approach. Ecological modelling, 176(1-2), 43-64.
[30]. Sofiyabadi, J., Kolahi, B., Valmmohamadi, C. & Mohedi, M. (2015). Application of Fuzzy Cognitive Map in Determining the Organization’s Success Path. Journal of Productivity Management, 9(3), 201-223. [In Persian]
[31]. Valimoghaddam Zanjani, S., Kamali, N. and Mojtabazadeh, M. (2021). Design and Validation of the Internationalization Model of Higher Education in Medical Sciences Universities. Educ Strategy Med Sci, 14(2), 49-61. [In Persian]
[32]. Rosdi, M. N. H. M., Mahmood, W. H. W., Razik, M. A., & Kamat, S. R. (2021). Fuzzy analytic hierarchical process implementation on enhancing manufacturing responsiveness. Journal of King Saud University-Engineering Sciences.
[33]. Mirzaei, A. & Mazroui Nasrabadi, E. (2024). Modelling and Scenario Analysis of the Causal Conditions of the Ripple Effect in the Supply Chain of Iran's Food Industry. Research in Production and Operations Management, 15(1), 1-28. [In Persian]
[34]. Zarei, M., Mohseni, F., & Sohrabi, P. (2024). Correlates of spatial structure variability in Bushehr port-city: A comprehensive analysis using fuzzy cognitive mapping methodology. Journal of Infrastructure, Policy and Development, 8(11), 8789.
[35]. Sarmad, Z., Bazargan, A., Hejazi, A., (2022). Research Methods in Behavioral Sciences, Ageh Publications, Tehran. [In Persian]
[36]. Lawshe CH. (1975). A quantitative approach to content validity. Personnel psychology, 28(4), 575-563.