[1] Wang ZY, Tizani W, Wang QY. “Strength and initial stiffness of a blind-bolt connection based on the T-stub model”. Engineering Structures, 2010, No. 32, pp. 2505-2517.
[2] Tizani W, Al-Mughairi A, Owen J, Pitrakkos T. “Rotational stiffness of a blind-bolted connection to concrete-filled tubes using modified Hollo-bolt”. Journal of Constructional Steel Research, 2013, No. 80, pp. 317-331.
[3] Elghazouli AY, Malaga-Chuquitaype C, Castro JM, Orton AH. “Experimental monotonic and cyclic behavior of blind bolted angle connections”. Engineering Structures, 2009, No. 31, pp. 2540-2553.
[4] Wang J, Gue Sh. “Structural performance of blind bolted end plate joints to concrete-filled thin-walled steel tubular columns”. Thin-Walled Structures, 2012, No. 60, pp. 54-68.
[5] Tizani W, Pitrakkos T. “Performance of T-stub to CFT joints using blind bolts with headed anchors”. Journal of Structural Engineering, 2015. 141(10): 04015001
[6] Pascual AM, Romero ML, Tizani W. “Thermal behavior of blind-bolted connections to hollow and concrete-filled steel tubular columns”. Journal of Constructional Steel Research, 2015, No. 107, pp. 137-149.
[7] Wang Zh, Tao Zh, De-Shan Li, Han L. “Cyclic behavior of novel blind bolted joints with different stiffening elements”. Thin-Walled Structures, 2016, No. 101, pp. 157-168.
[8] Wang J, Beibei Li, Jinchao Li. “Experimental and analytical investigation of semi-rigid CFST frames with external SCWPs”. Journal of Constructional Steel Research, 2017, No. 128, pp. 289-304.
[9] Wang J, Spencer BF. “Experimental and analytical behavior of blind bolted moment connections”. Journal of Constructional Steel Research, 2013, No. 82, pp. 33-47.
[10] Design of steel structures (Eurocode 3), Part 1-8: Design of joints, 2005.
[11] Lindapter. Type HB-Hollo-Bolt. Cavity fixings 2, product brochure. UK: Lindapter International, 2016.
[12] SAC/BD-97/02 Version 1.1, “Protocol for fabrication, inspection, testing, and documentation of beam-column connection tests and other experimental specimens”. SAC report, 2002.