[1] Dhakal, RP. (2010). Damage to Non-structural Components and Contents in 2010 Darfi eld Earthquake. Bulletin of the New Zealand Society of Earthquake Engineering, 43, (4), 404−411.
[2] Priestley, MJN., Sritharan, S., Conley, JR., Pampanin, S. (1999). Preliminary results and conclusions from The PRESSS five-story precast concrete test building. PCI Journal, 44 ( 6), 42–67. DOI:10.15554/pcij.11011999.42.67.
[3] Federal Emergency Management Agency., (2011).FEMA E-74Reducing the Risks of Nonstructural Earthquake Damage A Practical Guide. Washington, D.C.
[4] Fulop, L.A. Dubina, D. (2004).Performance of wall-stud cold-formed shear panels under monotonic and cyclic loading, part II: numerical modelling and performance analysis.
Thin-Walled Structures, 42, 339–349.
https://doi.org/10.1016/S0263-8231(03)00064-8.
[5] Kanvinde, A.M.Deierlein, G.G. (2006). Analytical models forthe seismic performance of gypsum drywall partitions.
Earthquake Spectra, 22, 391–411.
https://doi.org/10.1193/1.2191927
[6] Restrepo, J.I. Lang, A.F. (2011). Study of loading protocols in light-gauge stud partition walls.
Earthquake Spectra, 27, 1169–1185.
https://doi.org/10.1193/1.3651608
[7] Kanvinde, A.M.Deierlein, G.G. (2006). Analytical models for the seismic performance of gypsum drywall partitions.
Earth Spectra 22, 391–411.
https://doi.org/10.1193/1.2191927
[8] Häupl, P. Fechner, H.Petzold, H. (2004). Interior retrofit of masonry wall to reduce energy and eliminate moisture damage: comparison of modeling and field performance. In: Thermal performance of the exterior envelopes of whole buildings IX. Atlanta: GA: ASHRAE, 1-12.
[11] Che-Wei, C. Cheng-Ru, W. Chin-Tsai, L.Huang-Chu, C. (2007). An application of AHP and sensitivity analysis for selecting the best slicing machine.
Computer and Industrial Engineering, 52 (2), 296-307.
https://doi.org/10.1016/ j.cie.2006.11.006.
[14] Tabarak, M.A. William, D. (2003). Artificial neural network for selection of buildable structural systems.
Engineering Construction and Architectural Management Journal, 10(4), 263-271.
https://doi.org/10.1108/09699980310489979
[18] Basak Sener, M Lutfi Suzen and V. Doyura. (2006). Landfill site selection by using geographic information system. Environmental Geology, 49 ( 3), 376-388.
[19] Al-Harbi, K.M.A.-S. (2001). Application of the AHP in project management. International Journal of Project Management, 19, 19- 27.
[22] Duen-Ren Liua and Y.-Y. Shih. (2005). Integrating AHP and data mining for product recommendation based on customer lifetime value,
Information & Management, 42 (3), 387-400.
https://doi.org/10.1016/j.im.2004.01.008.
[23] Semih Onut and S. Soner. (2011). Transshipment site selection using the AHP and TOPSIS approaches under fuzzy environment. Waste Management, 28(9), 1552-1559. https://doi.org/10.1016/j.wasman.2007.05.019.