[1]Askari, MD (2011). Analysis and ranking of project risk in large industries using fuzzy method, Master's thesis in economic socio-economic systems, Isfahan University of Technology.
[2] Hayati, M. (2009). Risk management in tunnel construction projects, M.Sc. thesis, Mining Engineering, Tarbiat Modarres University.
[3] Zeng, R., Xiao, H., and Zhang, H. (2015). The Model of Risk Management in Project Logistics, pp. 61-65.
[4] Mousavi, S.M. (2010). A Model for Project Risk Assessment (Case Study of Aras Reservoir Dam), Master's thesis in Industrial Management, Tarbiat Modares University.
[5] Kerzner, H.R. (2015). Project Management 2.0. John Wiley & Sons.
[6] Feng, Z., Zhang, S.B., and Gao, Y. (2015). Modeling the Impact of Government Guarantees on Toll Charge, Road Quality and Capacity for Build-Operate-Transfer (BOT) Road Projects. Transportation Research Part A: Policy and Practice,Vol.78,PP. 54-67.
[7] Bao, H. Peng, Y. Ablanedo-Rosas,J.H and Gao, H. (2015). An Alternative Incomplete Information Bargaining Model for Identifying the Reasonable Concession Period of a BOT Project. International Journal of Project Management, Vol.33,No.5,PP.1151-1159.
[8] Khodeir, L.M., and Mohamed, A.H.M. (2015). Identifying the Latest Risk Probabilities Affecting Construction Projects in Egypt According to Political and Economic Variables. From January 2011 to January 2013. HBRC Journal,Vol.11, No.1, PP.129-135.
[9] Qing, L., Rengkui, L., Jun, Z., and Quanxin, S. (2014). Quality Risk Management Model for Railway Construction Projects. Procedia Engineering, Vol.84, PP.195-203.
[10] Hwang, B.G., Zhao,X., and Toh, L.P. (2014). Risk Management in Small Construction Projects in Singapore: Status, Barriers and Impact. International Journal of Project Management,Vol.32, NO1, PP.116-124.
[11] Taylan, O., Bafail, A.O., Abdulaal, R.M., and Kabli, M.R. (2014). Construction Projects Selection and Rrisk Assessment by Fuzzy AHP and Fuzzy TOPSIS Methodologies. Applied Soft Computing, Vol.17, PP.105-116.
[12] Abbasi, A. Razanian, A. (1394). Identification and Evaluation of BOT Projects with Risk Management Approach Using AHP_DEA Method, Financial Knowledge Analysis of Securities, Volume 4, Issue 25, Pages 79-69.
[13] Weerabathiran, R., Srinath, K.A.(2012). Application of the extent analysis method on fuzzy AHP. Int. Journal of Engineering Science and Technology,Vol.4, NO.7, pp. 3472-3480.
[14] Ateş, N., et al. Multi Attribute Performance Evaluation Using a Hierarchical Fuzzy TOPSIS Method. Fuzzy Applications in Industrial Engineering. C. Kahraman, Springer Berlin Heidelberg. 2006. 201: 537-572.
[15] Kahraman,Cengiz, Etay,Tijen and Buyukozkan,Gulcin "A fuzzy optimization model for QFD planning process using analytic network approach", European Journal of Operational Research,[2004],110-132.
[16]Chen, S-J., Hwang, C-L.(1992). Fuzzy Multiple Attribute Decision Making Methods and Applications, Springer-Verlag, Berlin.
[17] Presidential Strategic Planning and Control Office (2008). Risk Management in Projects, No. 659.
[18] Nazari,A. Kia, A. (2014). Comprehensive Project Risk Model Based on Detailed Fuzzy Criteria (Case Study of the Project for Wellhead Facilities and Pipelines in Azar Field), 10th International Conference on Project Management.