Journal of Structural and Construction Engineering

Journal of Structural and Construction Engineering

Patterning of Decision-Making Units in Improving Claims Management in Construction Projects Using a Combined Method of System Dynamics Simulation and Data Envelopment Analysis

Document Type : Original Article

Authors
1 PhD Student, Department of Civil Engineering, Ar.C., Islamic Azad University, Arak, Iran
2 Associate Professor, Department of Industrial Engineering, Ar.C., Islamic Azad University, Arak, Iran
3 Assistant Professor, Department of Civil Engineering, Ar.C., Islamic Azad University, Arak, Iran
4 Associate Professor, Department of civil Engineering, Ar.C., Islamic Azad University, Arak, Iran
10.22065/jsce.2026.579884.3964
Abstract
Claims management, as one of the fundamental challenges in construction projects, is a process whose proper identification, analysis, and management are essential to prevent disputes, delays, and additional costs. Despite the significance of this process, evaluating its efficiency in projects is inherently complex. Conventional Data Envelopment Analysis (DEA) models, due to their static nature and reliance on historical data, are unable to provide a framework for future forecasting and decision-making. This research aims to propose a hybrid model to address this deficiency and improve the efficiency evaluation of claim management processes. To this end, by employing a System Dynamics (SD) simulation approach, the inputs and outputs of the claim management process are forecasted for future time intervals, which are subsequently evaluated using a DEA model. To validate the proposed model, the performance of ten major urban construction projects in Tehran province was analyzed. The results obtained from the model determined the efficiency status of each project during the specified period. Finally, by identifying inefficient units, performance improvement strategies and operational solutions were proposed to shift these projects toward the efficiency frontier. The findings of this study demonstrate that the proposed hybrid approach, by shifting the perspective from retrospective analysis to proactive/predictive approaches, provides an effective decision-making tool for managers to optimize resource allocation while mitigating risks arising from contractual claims in construction projects.
Keywords
Subjects


Articles in Press, Accepted Manuscript
Available Online from 01 October 2026

  • Receive Date 02 May 2026
  • Revise Date 12 September 2026
  • Accept Date 01 October 2026