[1] Asadabadi, M. R., Saberi, M., & Chang, E. (2017, July). Logistic informatics modelling using concept of stratification (CST). In 2017 IEEE international conference on fuzzy systems (FUZZ-IEEE) (pp. 1-7). IEEE.
[2] Asadabadi, M. R., Saberi, M., & Chang, E. (2017, July). Logistic informatics modelling using concept of stratification (CST). In 2017 IEEE international conference on fuzzy systems (FUZZ-IEEE) (pp. 1-7). IEEE.
[3] Adar, E., Ince, M., Karatop, B., & Bilgili, M. S. (2017). The risk analysis by failure mode and effect analysis (FMEA) and fuzzy-FMEA of supercritical water gasification system used in the sewage sludge treatment. Journal of Environmental Chemical Engineering, 5(1), 1261-1268.
[4] Diaz-Balteiro, L., González-Pachón, J., & Romero, C. (2017). Measuring systems sustainability with multi-criteria methods: A critical review. European Journal of Operational Research, 258(2), 607-616.
[5] Kaut, M., Vaagen, H., & Wallace, S. W. (2021). The combined impact of stochastic and correlated activity durations and design uncertainty on project plans. International Journal of Production Economics, 233, 108015.
[6] Badawy, M., Alqahtani, F., & Hafez, H. (2022). Identifying the risk factors affecting the overall cost risk in residential projects at the early stage. Ain Shams Engineering Journal, 13(2), 101586.
[7] Islam, M. S., Nepal, M. P., Skitmore, M., & Drogemuller, R. (2021). Risk induced contingency cost modeling for power plant projects. Automation in Construction, 123, 103519.
[8] Hazır, Ö., & Ulusoy, G. (2020). A classification and review of approaches and methods for modeling uncertainty in projects. International Journal of Production Economics, 223, 107522.
[9] Valipour, A., Sarvari, H., & Tamošaitiene, J. (2018). Risk assessment in PPP projects by applying different MCDM methods and comparative results analysis. Administrative Sciences, 8(4), 80.
[10] Abdel-Basset, M., Ali, M., & Atef, A. (2020). Uncertainty assessments of linear time-cost tradeoffs using neutrosophic set. Computers & Industrial Engineering, 141, 106286.
[12] Sanda, Y. N., Anigbogu, N. A., Nuhu, L. Y., & Olumide, O. S. (2020). A Life-Cycle Framework for Managing Risks in Public Private Partnership Housing Projects. Journal of Engineering, Project & Production Management, 10(1).
[13] Liu, J., Yin, Y., & Yan, S. (2019). Research on clean energy power generation-energy storage-energy using virtual enterprise risk assessment based on fuzzy analytic hierarchy process in China. Journal of Cleaner Production, 236, 117471.
[14] Ribas, J. R., Arce, M. E., Sohler, F. A., & Suárez-García, A. (2019). Multi-criteria risk assessment: case study of a large hydroelectric project. Journal of Cleaner Production, 227, 237-247.
[15] Valipour, A., Sarvari, H., & Tamošaitiene, J. (2018). Risk assessment in PPP projects by applying different MCDM methods and comparative results analysis. Administrative Sciences, 8(4), 80.
[16] Singha, M., & Debasis, S. (2017). Project risk analysis for elevated metro rail projects using fuzzy failure mode and effect analysis (FMEA). International Journal of Engineering Technology Science and Research, 4(11).
[17] Danielsen, D. A., Torp, O., & Lohne, J. (2017). HSE in civil engineering programs and industry expectations. Procedia engineering, 196, 327-334.
[18] Roshani, S. (2021). Project Risk Identification by Integrating Modified FMEA Technique with AHP Method: A Case Study of Piling Project at Sea. In 7th International Conference on Civil Engineering, Architecture, and Urban Planning.
[19] Mirbaroni, L., & Rezvani, H. (2017). A Case Study of Risk Management in Automotive Industry Projects Using RFMEA Method. In 15th National Student Conference on Industrial Engineering, Yazd.
[20] Xu, B., Chen, D., Li, H., Zhuang, K., Hu, X., Li, J., ... & Patelli, E. (2019). Priority analysis for risk factors of equipment in a hydraulic turbine generator unit. Journal of Loss Prevention in the Process Industries, 58, 1-7.
[21] Khalili, M. R., Ahmadi, V., & Jalali, M. (2019). Investigating and Prioritizing the Impact of Risk Management Dimensions on the Success of Construction Projects in Mashhad. In 4th Technology Development Symposium and International Conference on Innovative Findings in Civil Engineering, Architecture, and Construction Industry in Iran (2019 Ircivil).
[21] Ansari, R., & Aminranjbar, A. (2018). Investigating the Integrated Approaches of Earned Value Management and Risk Management in Estimating the Cost and Time of Construction Projects. In International Conference on Civil Engineering, Architecture, and Urban Development in Iran.
[23] Dehghani, J. (2015). Identification and Prioritization of Risks in the Life Cycle of Dam Construction Projects Based on PMBOK Standard. In International Conference on Humanities, Architecture, Civil Engineering, and Urban Development.
[24] Ware, S., Yang, F., Zhu, Y., Su, R., & Lin, L. (2018). An efficient method of matrix multiplication for heaps of pieces. IFAC-PapersOnLine, 51(7), 206-211
[25] Organization for Planning and Budget. (1999). Agreement, General Conditions, and Special Conditions of Contracts and their Regulations. (Document No. 4311).
[26] Organization for Planning and Budget of Iran. (2003). Guidelines for Adjusting Contract Amounts. (Document No. 173073).
[27] Organization for Planning and Budget. (1981). Guidelines for Calculating Delays Caused by Delayed Payment of Progress Reports. (Report No. 5090).
[28] Organization for Planning and Budget. (1982). Guidelines for Calculating Delays Caused by Delayed Payment of Progress Reports. (Report No. 1300).
[29] Zadeh, L. A. (2016). Stratification, target set reachability and incremental enlargement principle. Information Sciences, 354, 131-139.
[30] Li, Y., & Wang, X. (2019). Using fuzzy analytic network process and ISM methods for risk assessment of public-private partnership: A China perspective. Journal of Civil Engineering and Management, 25(2), 168-183.
[31] Asadabadi, M. R. (2018). The stratified multi-criteria decision-making method. Knowledge-Based Systems, 162, 115-123.
[32] Asadabadi, M. R., & Zwikael, O. (2021). Integrating risk into estimations of project activities' time and cost: A stratified approach. European journal of operational research, 291(2), 482-490.