[1] Lutfi, S., Zanganeh, A. (2017). optimal selection management of contractors in construction projects using ANP network analysis. master's thesis in Civil Engineering-Engineering and Construction Management, Faculty of civil engineering, lamali gurgani Institute of Higher Education, 1-5.(in Persian)
[2] Alptekin. O., Alptekin, N. (2017). Analysis of Criteria Influencing Contractor Selection Using TOPSIS Method. IOP Conference Series: Materials Science and Engineering, 245(6), 1-9.
[3] Khayambashi, A., Monirabbasi, A. (2023). Contractor Ranking Model with Approach to Reduce Construction Project Delays and Optimization of Coefficients by Genetic Algorithm. Amir Kabir Journal Of Civil Engineering, 54(10), 3989-4006.(in Persian)
[4] El-Sayegh, SM., Basamji, M., Haj Ahmad, A., Zarif, N. (2021). Key contractor selection criteria for green construction projects in the UAE. International Journal of Construction Management, 21(12), 1240-1250.
[5] Azimiaghdash, M., Abdarbakhshayesh., M. (2022). Tenders for construction and non-construction projects. Tehran: innovative publications, second edition, 232.(in Persian)
[6] Esfandiari, M., Rezaian, J. (2021). Identification and evaluation of the quality ranking of gas industry suppliers with the approach of expanding quality performance by the method of the process of hierarchical analysis. master's thesis, Mazandaran University of Science and Technology, Faculty of engineering and technology, 1-4.(in Persian)
[7] Martin H, Koylass J, Welch F. (2018). An exploration of the consistency limits of the analytical hierarchy process and its impact on contractor selection. International Journal of Construction Management, 18(1), 14–25.
[8] Mokhtar, A., Nasiri, M. (2012). Analyze the strengths and weaknesses of project contractors evaluation and ranking methodologies over the past decade. 9th International Conference on Industrial Engineering.
[9] Abbasi, O., Abbasianjahromi, H., Norouzian, F. (2016). Identify subcontractors selection criteria in construction companies with new approach using Kano model. Journal of structural and construction engineering, 3(2), 19-29.(in Persian)
[10] Mahbubifard, M., Bagheri, M. (2017). Presentation of the contractor selection model with the approach of Phase topsis and phase inference System (Case Study: Bandar Abbas Gas Transmission Line 6). senior expert thesis in industrial management of production orientation, Shahid Ashrafi University of Isfahan.
[11] Delegation of ministers. (2002). Code of Referral of Contracts to Contractors.(in perisan)
[12] Naghizadeh Vardin, A., Ansari, R., Khalilzadeh, M. (2023). Optimization of Contractor Selection Process in Iranian Law of Tenders Utilizing VIKOR Method (Case Study: Water Industries in East Azerbaijan Province). Journal of civil and environmental engineering of the University of Tabriz, 1(110), 13-30.(in perisan)
[13] Hoseini, R., Ghaforifard, M. (2022). Identifying and prioritizing the factors affecting the selection of the contractor in the General Directorate of Highways and Road Transportation of Khorasan Razavi. Journal of Operations Management, 1(4). 149-173.(in perisan)
[14] Valipour, A., Jamali, M. (2021). Hybrid SWARA-COPRAS Method For Construction Contractors Selection: South ZagroSs Company CasEe Study, Journal of structural and construction engineering, 8(1), 251-274.(in perisan)
[15] Javidi Sabbaghian, R., Shamsi, Gh., Saghi, H. (2022). Developing Multiple Criteria Decision-Making Model based on the Best-Worst-VIKOR Method for Evaluation of Civil Projects Contractors; Case Study of Civil Projects in Southern Khorasan Province. Journal of civil and environmental engineering of the University of Tabriz, 4(105), 11-22.(in perisan)
[16] Liu, X., Chen, S., Ding, Z., Xu, B. (2023). Bidding Evaluation and Contractor Selection Using Balance Index Model and Comprehensive Input Efficiency Based on Data Envelopment Analysis. Systems,11(5), 245.
[17] Alshamrani, O.S.D., Saleem, M., AlYousif, I. K., & Alluqmani, A. (2023). Development of a pre-qualification and selection framework for construction projects contractors in Saudi Arabia,. Journal of Asian Architecture and Building Engineering, 22(3), 1545–1563.
[18] Naji, K.K., Gunduz, M., & Falamarzi, M.H. (2022). Assessment of Construction Project Contractor Selection Success Factors considering Their Interconnections. KSCE Journal of Civil Engineering, 26(9), 3677-3690.
[19] Marović, I., Perić, M., & Hanak, T. (2021). A multi-criteria decision support concept for selecting the optimal contractor. Applied Sciences, 11(4), 1660, 1-17.
[20] Vinokur, I., & Ponomareva, S. (2021). Innovation-oriented resource management model proposed on the basis of the methodology of economic assessment of resource capabilities of oil and gas industry contractors. Paper presented at the SHS Web of Conferences, 116.
[21] Dadashi, M., Mohammadi, F. (2019). Determining the right contractor for construction projects using the Analysis Hierarchical Process (AHP). Quarterly Scientific Journal of Technical and Vocational University, 16(1), 93-106.(in perisan)
[22] Dalkey, N., & Helmer, O. (1963). An experimental application of the Delphi method to the use of experts. Management science, 9(3), 458-467.
[23] Stone, F. L., & Busby, D. (2005). The Delphi Method. Research methods in family therapy, 238-253.
[24] Malek Zadeh, G., Kazemi, M., & Lagzian, M. (2014). Organizational Intelligence: Designing a Hierarchy Model for Iranian State Universities with a General Approach. Transformation Management Research, 5(10), 94-124.
[25] Soleimani-Damaneh, J., Hamidi, M., Sajadi, N. (2011). Evaluating the Performance of Iranian Football Teams Utilizing Linear Programming. American Journal of Operation Research, 1(2), pp. 65-72.
[26] Stević, Ž., Pamučar, D., Puška, A., & Chatterjee, P. (2020). Sustainable supplier selection in healthcare industries using a new MCDM method: Measurement of alternatives and ranking according to Compromise solution (MARCOS). Computers & Industrial Engineering, 140, 106231.
[27] Zavadskas, E.K., Kaklauskas, A., Peldschus, F., & Turskis, Z. (2007). Multi-attribute assessment of road design solutions by using the COPRAS method. The Baltic journal of Road and Bridge engineering, 2(4), 195-203.