[1] AL-Momani and Ayman, H., (2000). Construction delay: a quantitative analysis. International journal of project Management, 18.
[2] Mezhar, T.M. and Tawil. W., (2008). Causes of delays in the construction industry in Lebanon. Engineering Constructions and Architectural management, 53, pp. 252-260.
[3] Frimpong, Y., Olywoye, J., and Crawford, L., (2003). Causes of delay and cost overruns in construction of groundwater projects in a developing country: Ghana as a case study. International Journal of Project Management, 21, pp. 321-326.
[4] Ghutbi, Zohreh (2008). Study of the causes of delays in the construction projects of the country's airport network, Tehran. Center for Productivity Studies and Management, Master's Thesis.
[5] Amidi, Mohammad. (2014). Investigating the causes of Bahman project delay in order to achieve a suitable strategy in the planning and implementation of projects in Iran Energy Development Company. Master's Thesis, School of Management, and University of Tehran.
[6] Eshtrhedian, Ehsanullah; Nasr Azadani, Massoud; Safavi, Alireza; Alikhani, Abolfazl (2008). Investigation of the causes of delay in the implementation of urban construction projects according to the project factors. the 6th International Project Management Conference, Tehran.
[7] Assaf, S. A., Al-Hejji, S., (2006). Causes of delay in large construction projects. International Journal of Project Management, 2(2), pp. 925-913.
[8] Fathi, Mojtaba; Najafian, Mojtabi (2008). Study and investigation of the causes of delays in construction projects in Kermanshah province. the first national conference on engineering and construction management.
[9] Babaei, Hossein, (2018). Identifying the causes of delay in the implementation of road construction projects in Lorestan province and ways to reduce it. Master’s thesis, Islamic Azad University, Borujerd.
[10] Sobhiyah, M. H., (2005). The review of application of design-build delivery system in a development project. Scientific and empirical journal of management and development, 24, pp. 90–104.
[11] Nejadsabzai, Parvaneh (2013). Investigation and identification of effective factors in the implementation delay of the Maruk dam project. Academic Jihad of Lorestan Province,www.jdlorestan.ac.ir/modules.
[12] Sadeghizadeh, Mohammad and Malekinejad, Ali (2015). Investigating the reasons for the prolongation of Mehr housing construction projects and providing appropriate solutions (case study: Jiroft city). the second comprehensive conference on urban management of Iran with the approach of integrated urban management and smart city.