[1] Behm M. (2005). Linking construction fatalities to the design for construction safety concept. Journal of Safety Science. 43(8), 589-611.
[2] DarbarRazavi, M., Rajaei H., Gerami, M. (2011). Identifying the Factors Affecting Safety Performance in Construction Projects, Second International Conference on Strategic Project Management.
[3] Shariat, SM. and Monavari, SM.)2008.( Introduction to Environmental Impact Assessment. Tehran: Environmental Organization Publications,115-270.
[4] Lingard, HC., Cooke, T., Blismas, N. (2010). Safety climate in conditions of construction subcontracting: a multiālevel analysis. Journal of Construction Management and Economic, 28(8), 813–825.
[5] Goodarzi, R., Arghami, SH., Pouyakian, M. (2016). Identification of factors affecting safety culture in Iranian thermal power plants. Journal of Occupational Health Engineering, 3(2),12-20.
[6] Modari, M., DashtiShiramin, M., KarimiShirazi, H. (2019). Identification and Prioritization of Influencing Factors on Safety Performance with hybrid Fuzzy DEMATEL and Analytical Network Process Approach (DANP)(Case Study: A Combined Cycle Power Plant). Journal of Health and Safety at Work, 9(1), 49-60.
[7] Mohajer, M., Ardeshir, A. (2016). Safety Risk Analysis of Construction Projects Using AHP-DEA Integrated Method. Amirkabir Jounrnal of Civil Engineering, 48(3), 217-226.
[8] MohammadiKhah, S., Khosravan, Sima. (2018). Identification and Prioritization of Safety Risks in Petrochemical Port of Imam Port by ANP Network Analysis Process Technique. In: Second National Conference on New Topics in Computer and Information Technology. Mahshar: Khuzestan Province Computer Guild Organization, 2-10.
[9] TaherKhani, F., MirzaEbrahimTehrani, M., Melmasi, S. (2017). safety risk management based on fuzzy logic at underground projects. Journal of Occupational Hygiene Engineering. 4(3), 49-62.
[10] HosseiniDehshiri, SJ., Arab, A., Mohaghar, A. (2016). Identification and Prioritization of Human Resources Risks Based on Fuzzy DEMITEL. In: International Conference on Industrial Engineering and Management. Tehran: Permanent Secretariat of Conference, 3-15.
[11] Hatefi, SM., Heydari, Ali. (2019). Evaluating Construction Projects based on the Risk Factors by using an Integrated Fuzzy AHP and Fuzzy VIKOR Model. Journal of Structural and Construction Engineering, 5(4), 156-175.
[12] Xie, X., Guo, D. (2018). Human factors risk assessment and management: process safety in engineering. Process Safety and Environmental Protection, 113, 467-482.
[13] Adeleke, AQ., Bahaudin, AY., Kamaruddeen, AM., Bamgbade, JA., Salimon, MG., Khan, MW., Sorooshian, S. (2018). The Influence of Organizational External Factors on Construction Risk Management in Nigerian Construction Companies. Safety and Health at Work, 9(1), 115-124.
[14] Ning, X., Qi, J., Wu, C. (2018). A quantitative safety risk assessment model for construction site layout Planning. Safety Science, 104, 246-259.
[15] Rezaiean, A., Hoseini, SA. (2019). Selecting the Optimal Building System Using Multiple Criteria Decision Making Emphasising on Three Methods of TOPSIS , SAW, AHP. Journal of Structural and Construction Engineering, 2(2), 156-175.
[16] Yeh, TM., Huang, YL. (2014). Factors in determining wind farm location: Integrating GQM, fuzzy DEMATEL, and ANP. Journal of Renewable Energy, 66, 159-169.
[17] Dalalah, D., Hayajneh, M., Batieha, F. (2011). A fuzzy multi-criteria decision making model for supplier selection. Expert systems with applications, 38.