[1] Salmani, A. (1395). Claim Management and identifying the main causes of claims in construction projects. 1th International Conference and 3th National Conference on Construction and Project Management.Tehran: Islamic Azad University of Central Tehran Branch.
[2] Alizadeh, A. Rezaeian, A. and Mehdikhani, M. (1395). Performance assessment of the Project Management Office (PMO) in preventing contractors' claims in construction projects. 1th Conference on Applied Research in Civil Engineering (Structural Engineering and Construction Management). Tehran: Sharif University of Technology.
[3] Gholhaki, M. Kheyroddin, A. and Ghorbani, A. (1397). A model to determine the share amount of effective factors on contractual claims of contractors using radial basis function. Journal of Civil and Environmental Engineering, University of Tabriz, 48 (4).
[4] Dehghani, R. and Hosseininia Marzieh. (1396). Identification of the critical factors of the claim in the areas of time and cost from the perspective of employers, consultants and contractors. International Conference on Civil Engineering, Architecture and Urban Planning in Contemporary Iran. Tehran: Shahid Beheshti University.
[5] Pilzoor, A. and Saghi, H. (1396). Proposal of the use of project management knowledge in the litigation process to expedite claims management in development projects. 5th International Congress of Civil Engineering, Architecture and Urban Development. Tehran.
[6] Jalali Mehmandoost, N. Rezaei Nik, E. and Hosseini Masoom, J. (1396). Claim management in refinery projects (case study: Shahid Hasheminejad Gas Refining Company). 3th International Conference on Industrial Management and Engineering. Theran: University of Mohaghegh Ardabili.
[7] Mirzaei Feyzabadi, H. (1393). Identification of the factors affecting the occurrence of claims and provide solutions to reduce and manage claims in construction projects. MSc Thesis in Civil Engineering Department, Ferdowsi University of Mashhad.
[8] Chanson, H. (1996). Some Hydraulic Aspects during Overflow above Inflatable Flexible Membrane Dam. Report CH47/96, Dept. of Civil Engineering, University of Queensland, Australia, May, 60 pages.
[9] Kahl, T. and Ruell, S. (1989). Flashboard alternatives including rubber dams. Proceedings of Waterpower ‘89’ Niagara Falls, New York, N.Y., pp. 447-456.
[10] Plaut, R.H. Liapis, S.I. and Telionis, D.P. (1998). When The Levee Inplates. Civil Engineering, January, pp. 62-64.
[11] Caspian Consulting Engineers. (1398). Interview and review company documents.
[12] Sepidrood. (1398). Interview and review company documents.
[13] Sazeh Pardaz. (1398). Interview and review company documents.
[14] Regional Water Company of Mazandaran. (1398). Interview and review company documents.
[15] Regional Water Company of Gilan. (1398). Interview and review company documents.