[1] Badri, A., Nadeau, S., & Gbodossou, A. (2011). Proposal of a risk-factor-based analytical approach for integrating occupational health and safety into project risk evaluation. Accident Analysis and Prevention, 48, 223-234.
[2] Jin, X.H. (2011). Model for efficient risk allocation in privately financed public infrastructure projects using neuro-fuzzy techniques. Journal of Construction Engineering Management, 137 (11), 1003- 1014.
[3] World Bank. (2003). Bank Group Private Sector Development Strategy Implementation Progress Report. Washington, D.C.
[4] Babaie, A., Hosseini, M., & Babaie, R. (2015). Promoting safety level of construction projects through risk management. National Conference on Architecture, Engineering and Urban Development, Mazandaran.
[5] Smith, N.J. (2003). Appraisal, risk and uncertainty. Thomas Telford Ltd, UK, London.
[6] Williams, T., (1995). A Classified Bibliography of Recent Research Relating to Project Risk Management, European. Journal of Operation Research, 85, 18-38.
[7] Khaksar, M., Shafeie, R., & Allah Veisi, B. (2008). Identification of origins of risk in construction projects, and method of their management (case study). Scientific-Research Journal of Farasooye Modiriat, 2 (7), 139-160.
[8] Brax, S.A., & Jonsson, K. (2008). Developing integrated solution offerings for remote diagnostics: a comparative case study of two manufacturers. Integr. Solution Offerings, 29 (5), 539–560.
[9] Bamford, J.D., Gomes-Casseres, B., & Robinson, M.S., (2003). Mastering Alliance Strategy: A Comprehensive Guide to Design, Management and Organization. Wiley, San Francisco, CA.
[10] Tam, W.Y.V., & Shen, L.Y. (2012). Risk management for contractors in marine projects. Organization, Technology and Management in Construction: An International Journal, 4 (1), 403–410.
[11] Mark, W., Cohen, P.E., & Glen, R.P. (2004). Project risk identification and management. AACE International Transaction. INT.01, 1-5.
[12] Chia, S.E.) 2006(. Risk assessment framework for project management. IEEE, 376–379
[13] Deputy Office of Strategic Planning and Supervision. (2008). Risk management in projects. Journal No. 659, Deputy Office of Technical Affairs, Formulation Criteria, and Reduction of Risk-taking resulted from Earthquake, Tehran.
[14] Nieto-Morote, A., & Ruz-Vila, A. (2011). A fuzzy approach to construction project risk assessment. International Journal of Project Management, 29, 220–231.
[15] Cooper, D., Grey, S., Raymond, G., & Walker, P. )2005(. Project Risk Management Guidelines: Managing Risk in Large Projects and Complex Procurements. Chichester: John Wiley & Sons, Ltd.
[16] Winch, G. (2002). Managing construction projects, an information processing approach. Oxford: Blackwell Publishing.
[17] Latham, M. (1994). Constructing the team. HMSO London.
[18] Ng, S.T., Wong, Y. M.W. & Wong, J. M.W. (2012). Factors influencing the success of PPP at feasibility stage – A tripartite comparison study in Hong Kong. Habitat International, 36 (4), 423-432.
[19] Grimsey, D., & Lewis, M.K. (2004). Public private partnerships: the worldwide Revolution in infrastructure provision and project finance. UK: Edward Elgar Publishing Limited.
[20] Umar, A.A., Idrus, A., & Khamidi, M.F. (2011). Barriers to the use of public-private partnerships for provision of public infrastructure in developing countries: review. National Postgraduate Conference. IEEE Conference Publications.
[21] Liu, T., & Wilkinson, S. (2011). Adopting innovative procurement techniques: Obstacles and drivers for adopting public private partnerships in New Zealand. Construction Innovation: Information, Process, and Management. 11(4), 452–469.
[22] Economic and Social Commissi on for Asia and the Pacific (ESCAP). (2011). A guidebook on public-Private partnership in infrastructure. United Nations.
[23] Danaie Fard, H., Delkhah, J., & Kiaiee, P. (2017). Identifying and prioritizing obstacles ahead of public-private sector partnership development. Scientific-Research Journal of Business Management, 29, 33-49.
[24] Sohrabi R., & Rostami, A. (2017). Prioritizing challenges exisiting in partnership contracts of public-private sector in infrastructure projects. Scientific-Research Journal of Management Optimization (Behbood Modiriat), 11 (3), 139-160.
[25] Makki Abadi, S.R., Behnia, C., & Akbari, A. (2014). Identification and evaluation of critical risks in HSR projects trough public-private partnership in developing countries. Journal of Structural and Construction Engineering, 1 (1), 5-18.
[26] Ardeshir, A., AmirI, M., & Mohajeri, M. (2013). Safety risk evaluation in mass housing projects through combination of fuzzy FMEA, fuzzy FTA, and AHP-DEA. Scientific-Research Journal of Iran Occupational Health, 10 (6), 78-91.
[27] Rezaeenour, J, & Mousavi Saleh, M. (2018). Evaluation and ranking of public-private partnership risk factors in water supply projects using FMEA and Fuzzy Synthetic Evaluation methods Acase study of Qom. Journal of Iran water resources research, 13 (4), 100-117.
[28] Keers, B.B.M., & Fenema, P.C.V. (2018). Managing risks in public-private partnership formation projects. International Journal of Project Management, 36, 861– 875.
[30] Qazi, A., Quigley, J., Dickson, A., & Kirytopoulos, K. (2016). Project complexity and risk management (ProCRiM): Towards modelling project complexity driven risk paths in construction projects. International Journal of Project Management, 34, 1183 – 1198.
[31] Zarezadeh, H, & Barkhordari Bbafqi, M.A. (2016). Risk assessment of public private partnership contract in highway projects: A comparison between simple and fuzzy methods. Journal of administrative Management, education and traning, 12(3), 481-492.
[32] Press D. Guidelines for Failure Mode and Effects Analysis (FMEA), for Automotive, Aerospace, and General Manufacturing Industries: CRC Press, 2003.
[33] Kumru, M., & Kumru, P. (2013). Fuzzy FMEA application to improve purchasing process in a public hospital. Applied Soft Computing, 13(1), 721–733.
[34] Abdelgawad, M., & Fayek, A.R. (2010). Risk in the management construction industry using combined fuzzy FMEA and fuzzy AHP. Journal of Construction Engineering and Managemen, 136 (9), 1028-1036, ASCE.
[35] Kia, M. (2010). Fuzzy logic in MATLAB. First issue, Kian Rayaneh Sabz Publication.
[36] Abdollah Zadeh, G., & Rastgoo, S. (2012). Risk evaluation in bridge construction projects through fuzzy fault tree analysis. National Conference on Civil Engineering and Architecture with an Emphasis on Sustainable Development, Khavaran Higher Education Institute, Mashhad.
[37] Keikha, R., & Hossein Abadi, H. (2013). Reviewing problems and obstacles ahead of effective organization of public-private sector partnership projects, and provision of Solutions. Seventh National Congress on Civil Engineering, Zahedan, University of Sistan and Baluchestan.