[1] Park, W. R., and Chapin, W. B. (1992). Construction bidding. Wiley, New York: Strategic pricing for profit.
[2] Yang, B., Geunes, J. and O’Brien, W. (2006). Resource constrained project scheduling: past work and new directions. Gainesville: Research Report, Department of Industrial and Systems Engineering, University of Florida, FL.
[3] Iraj, M., Hemmatian, M., Taheri Amiri, M. J., and ghenaat, O. (2019). Presentation of exact and metaheurestic solution method for minimization project completion time with considering budget constraint problem. Journal of Structural and Construction Engineering, 6 (3), 41-56.
[4] Yadollahi, M. and Rahimizade, A. (2018). Optimizing the implementation of development projects with limited resources using genetic algorithms. Third International Conference on Composition, Cryptography and Computing. Tehran: Iran University of Science and Technology, Narmak, 374-400.
[5] Alemtabriz, A., Ayough, A. and Baniasadi, M. (2016). Presentation and Solution of Critical Chain Project Scheduling Problem (CCPSP) model with consideration of feeding buffer. Journal of Industrial Management Studies, 14(42), 31-59.
[6] Soltani, R., Jolai, F., and Zandieh, M. (2010). Two Robust Meta-Heuristics for Scheduling Multiple Job Classes on a Single Machine with Multiple Criteria. Expert Systems with Applications, 37(8), 5951-5959.
[7] Peteghem, V.V. and Vanhoucke, M. (2010). “A Genetic Algorithm for the Preemptive and Non-Preemptive Multi-Mode Resource-Constrained Project Scheduling Problem. European Journal of Operational Research, 201(2), 409–418.
[8] Alikhanzadeh, W., Kazemi, M. and Laghziyan, M. (2014). Optimizing the balance of cost, time and quality in construction projects with the approach of examining the impact of material selection and labor. International Conference on Industrial Management and Engineering.Tehran: International Conference on Industrial Management and Engineering.
[9] Vicente, V. Sacramento, Q., and Francisco B., (2003). Resource-Constrained Project Scheduling: A critical Activity Reordering Heuristic. European Journal of Operational Research, 149(2003), 282–301.
[10] Hazir, O., Houari, M., and Erel, E., (2010). Robust scheduling and robustness measures for the discrete time/cost tradeoff problem. European Journal of Operational Research, 207(2), 633-643.
[11] Anagnostopoulos, K.P., and Kotsikas, L., (2010). Experimental evaluation of simulated annealing algorithms for the time– cost trade-off problem. Applied Mathematics and Computation, 217(1), 260-270.
[12] Raad, N., Shirazi, M and Ghodsypour, S. (2020). Selecting a portfolio of projects considering both optimization and balance of sub-portfolios. Journal of Project Management, 5(1), 1-16.
[13] Hesami, S. and Molaie, Z. (2015). Scheduling optimization of highway construction projects based on Lean thinking. Journal of Modeling in Engineering, 13(40), 33-42.
[14] Taheri Amiri, M.J., Haghighi, F., Eshtehardian, E., and Abessi, O., (2018). Multi-project time-cost optimization in critical chain with resource constraints. KSCE Journal of Civil Engineering, 22(10), 3738-3752.
[15] Taheri Amiri, M.J., Haghighi, F., Eshtehardian, E., and Abessi, O., (2019). Time-Cost-Quality trade off in Critical Chain Method with multi-mode activities by Multi Objective Particle Swarm Optimization. Journal of Structural Engineering and Construction. 6(1). 134-154.
[16] Taheri Amiri, M. J., Haghighi, F. R., Eshtehardian, E., Hemmatian, M., and Khaleqnejad, R., (2020). Optimization of time, cost and quality in critical chain method in multi-project Scheduling and resource constraints with considering utility function. Journal of Structural and Construction Engineering, 7 (3), doi: 10.22065 / jsce.2019.122218.1496.
[17] Taheri Amiri, M. J., Hemmatian, M., and Asghari, A. (2020). Prioritize and Optimal Selection of Projects with Best to Worth method VIKOR and Mathematical Programming. Journal of Structural and Construction Engineering, doi: 10.22065 / jsce.2020.209215.2000.
[18] Jones, D.F., Mirrazavi, S.K. and Tamiz, M. (2002). Multi-objective meta- heuristic: An overview of the current state-of-the-art. European Journal of Operational Research, 137(1), 1-9.
[19] Sharifinya, A. and Kolahan, F. (2005). Application of Tabu Search Algorithm in Multipurpose Planning of Flexible Production Systems. First International Conference and Seventh National Conference on Construction Engineering. Tehran: First International Conference and Seventh National Conference on Construction Engineering.
[20] Glover, F. (1989). Tabu search — Part I. ORSA Journal of computing, 1 (3), 190–206.
[21] Kolahan, F. and Liang, M., (1998). An adaptive TS approach to JIT sequencing with variable processing times and sequence-dependent setups. European Journal of Operational Research, 109(1), 142-159.
[22] Kolahan, F. (1999). Modeling and analysis of integrated Machine-level planning problems for automated manufacturing. PhD thesis. Mechanical and aeronautical engineering university of Ottawa.
[23] Bräysy, O. and Gendreau, M. (2005). Vehicle routing problem with time windows, Part II: Metaheuristics. Transportation Science, 39(1), 119–139.
[24] Laporte, G. Gendreau, M. Potvin, J. and Semet, F. (2000). Classical and modern heuristics for the vehicle routing. International Transactions in Operational Research, 7(4-5), 285-300.
[25] Toth, P. and Vigo, D. (2003). The granular tabu search and its application to the vehicle routing problem. INFORMS Journal on Computing, 15(4), 333–346.
[26] Paraskevopoulos, D.C. Repoussis, P. P., Trantilis, C. D., Loannou, G., and Prastacos, G. P. (2008). "A reactive variable neighborhood tabu search for the heterogeneous fleet vehicle routing problem with time windows. Journal of Heuristics, 14(5), 425–455.
[27] Hasançebi, O., Çarbaş, S., Doğan, E., Erdal, F., and Saka, M. P. (2009). Performance evaluation of metaheuristic search techniques in the optimum design of real size pin jointed structures. Computers and Structures, 87(5-6), 284-302.
[28] Gendreau, M., (2003). An Introduction to Tabu Search, in handbook of Metaheuristics, Glover, F., Kochenberger, G.A., (Eds.), Kluwer Academic publishers: Norwell.
[29] Glover, F. and Laguna, M. (1993). Tabu search in Modern Heuristic Techniques for Combinatorial Problems. C. R. Reeves Ed London: Blackwell Sciatic.
[30] Tran, D. H., Cheng, M. Y., Cao, M. T., (2015). Hybrid multiple objective artificial bee colony with differential evolution for the time-cost-quality trade off problem. Knowledge-Based Systems, 74(1), 176-186.
[31] Feng, C., Liu, L., and Burns, S. (1997). Using Genetic Algorithm to Solve Construction Time-Cost Trade-off Problems. Journal of Computing in Civil Engineering, 11(3), 184-189.
[32] Eshtehardiyan, E. (2008). Time-Cost Balance Using Genetic Algorithm and Fuzzy Logic in Expressing Uncertainties. PhD Thesis. Iran University of Science and Technology.
[33] Feng, C., Liu, L., and Burns, S., (2000). Stochastic Construction Time Cost Trade-off Analysis. Journal of Computing in Civil Engineering, 14(2), 117-126.
[34] Hegazy T., (1999). Optimization of construction time-cost trade-off analysis using genetic algorithms. Canidian Journal of Civil Engineering, 26(6), 685-697.
[35] Zhang, L., Du, J., and Zhang, S. (2014). Solution to Time-Cost-Quality Trade-off Problem in Construction Projects Based on Immune Genetic Particle Swarm Optimization. Journal of Management in Engineering, 30(2), 163- 172.
[36] El-Rayes K, and Amr Kandil A. (2005). Time-Cos-Quality Trade-off Analysis for Highway Constructions. Journal of Construction Engineering and Management, 131(4), 447-486.