1- تصمیم گیری چند معیاره فازی، حبیبی،آ. سرافرازی،ا.ایزدیار،ص.(1393) سیمای دانش،آذر، رشت، کتیبه گیل.
2- روش های تصمیم گیری چند شاخصه با نگرشی کاربردی، ترابی، سیدع. و باقرصاد، م. (1395) انتشارات دانشگاه تهران،صص134-137
3-Arish, A. Akbarpour, M. And Seyedesfahani, M, M. (2010). Model-based decision support in planning risk responses, International Journal of Industrial Engineering and Production Management, 20(3).
4-PMI, A Guide to the project management body of knowledge, fourth edition, Pennsylvania, Project ManagementInstitute, 2008.
5-Zayed, Tarek. Amer, Mohamed. and Pan,Jiayin. (2008). “Assessing risk and uncertainty inherent in Chinese highway projects using AHP.” International Journal of Project Management, 26, 408–419.
6-Nieto-Morote, A. and Ruz-Vila, F. (2011). “A fuzzy approach to construction project risk assessment.”International Journal of Project Management, 29. 220–231.
7-KarimiAzari, A.R. Mousavi, N. Mousavi, S.F. and Hosseini, S.B. (2011). “Risk assessment model selectionin construction industry.” Expert Systems with Applications, 38. 9105–9111.
8-Salehi sedgheyani, J. (2010). Provide a method for ranking risks of project activities based on CPM networksusing fuzzy and fuzzy TOPSIS methods, Journal of Industrial Management, 1(3), 69-82.
9-Samantra, C., Datta, S., & Mahapatra, S. S. (2014). Risk assessment in IT outsourcing using fuzzy decision-making approach: An Indian perspective. Expert Systems with Applications, 41(8), 4010-4022.
10-Rodríguez, A., Ortega, F., & Concepción, R. (2016). A method for the evaluation of risk in IT projects. Expert Systems with Applications, 45, 273-285.
11-Francom, T. ASMar, M.El, Ariaratnam, S. (2016). Performance analysis of construction manager at risk on pipeline engineering and construction projects. J. Manag. Eng. 32 (6).
12-P.naseri, O.yosefi, A.nilipoortabatabaei, (2013), Provide a risk assessment project model using a multi-objective decision approach, Industrial Engineering Journal, 48(1):125-135
13-Hung, Y.H. Chou, S.C.T. Tzeng, G.H. (2006). Using a fuzzy group decision approach-knowledge management adoption. In APRU DLI 2006 conference, University of Tokyo, Japan, 8(10).
14-Büyüközkan, G. & Güleryüz, S. (2016). An integrated DEMATEL-ANP approach for renewable energy resources selection in Turkey. International Journal of Production Economics, 182, 435–448
15-Buyle, M. Braet, J. & Audenaert, A. (2013). Life cycle assessment in the construction sector: A review. Renewable and Sustainable Energy Reviews, 26, 379–388.
16-Tadić S, Zečević S, Krstić M(2014). A novel hybrid MCDM model based on fuzzy DEMATEL, fuzzy ANP and fuzzy VIKOR for city logistics concept selection. Expert systems with applications. 41(18):8112-8128.
17-Martinsuo, M. Poskela, J. (2011). Use of evaluation criteria and innovation performance in the front end of innovation. Journal of Product Innovation Management 28 (6), 896–914.
18-Killen, C.P. Jugdev, K. Drouin, N. Petit, Y.(2012). Advancing project and portfolio management research: applying strategic management theories. International Journal of Project Management 30 (5), 525–538.
19-Kremmel T, Kubalik J, Biffle S (2011). Software project portfolio optimization with advanced multiobjective evolutionary algorithms. Applied Soft Computing. 11: 1416–1426.
20-Tzeng, G.H. Chiang C.H. Li, C.W. (2007), Evaluating intertwined effects in elearning programs: A novel hybrid MCDM model based on factor analysis and DEMATEL Expert Systems with Applications, 32 (4), 1028-1044.
21-Shieh J.I, Wu H.H. Huang K.K. (2010), A DEMATEL method in identifying key success factors of hospital service quality.Knowledge-Based Systems, 23, 277-282.
22-Faraji Sabokbar, H. Alavi Panah, K. Nami, M.Ashornezhad,Q(2013) Evaluation Banks credit and financial institutions location in sixth region of Tehran using DEMATEL and analytic network process method, Research in Human Geography, 3(45,: 94-114 [Persian].
23-Yang, J. L. & Tzeng, G.H. (2011). An Integrated MCDM technique combined with DEMATEL for a novel cluster-weighted with ANP method, Expert Systems with Applications, 38(3), 1417-142.
24-Lee, W.S. Huang, A. Y. Chang, Y.Y. Cheng, C.M. (2011), Analysis of decision making factors for equity investment by DEMATEL and Analytic Network Process. Expert Systems with Applications, 38(7), 8375-8383. .
25-Jokar, A, & Maleki, (2017). M. Provides a framework for assessing the readiness of companies from the perspective of successor architecture with the combined approach of gray and dimetile network analysis. New research in decision making, 2(1),94-73[Persian].
26-Divsalar, M., Safaii Qadikilai, A, & Mehedoshi, M. (2017). Development of DANP Decision Making Method Based on Phase Assumptions. New research in decision making,2(3),145-123 [Persian].