[1] L. Y. S. V. W. Y. T. C. M. T. a. D. Drew, "Mapping Approach for Examining Waste Management on Construction Sites," Journal of Construction Engineering and Management, vol. 130, no. 4, 2004.
[2] V. W. C.M. Tam Tam, "Waste reduction through incentives: a case study," Building Research & Information, vol. 36, no. 1, pp. 37-41, 2008.
[3] J. J. T. T. Corrie Clark "A Review of Construction and Demolition Debris Regulations in the United States," Critical Reviews in Environmental Science and Technology, vol. 36, no. 2, 2006.
[4] E. S. TH Mills, D Jarman, "A cost-effective waste management plan," Cost Engineering, vol. 41, no. 3, 1999.
[5] S. C. Begum R, Pereira JJ, Jaafar AH, "A benefit–cost analysis on the economic feasibility of construction waste minimization: the case of Malaysia," Resources, Conservation & Recycling, vol. 48, no. 1, pp. 86-98, 2006.
[6] H. M. Hao JL, Huang T, "A simulation model using system dynamic method for construction and demolition waste management in Hong Kong," Journal of Construction Innovation, vol. 7, no. 1, pp. 7-21, 2007.
[7] Y. H. Wang JY, "Construction waste management model based on system dynamics," System Engineering: Theory & Practice, vol. 29, no. 7, 2009.
[8] L. Y. S. H.P. Yuan , , Jane J.L. Hao , W.S. Lu "A model for cost–benefit analysis of construction and demolition waste management throughout the waste chain," Resources, Conservation and Recycling, vol. 55, pp. 604-612, 2011.
[9] H. T. Hirokazu Shima, Ryuji Matsuhashi, Yoshikuni Yoshida, "An Advanced Concrete Recycling Technology and its Applicability Assessment through Input-Output Analysis," Journal of Advanced Concrete Technology, vol. 3, 2005.
[10] C. F. Hendriks, Pietersen, H.S, Sustainable Raw Materials: Construction and Demolition Waste (report 22). France: RILEM Publication, 2000.
[11] V. W. Y. Tam, "On the effectiveness in implementing a waste-management-plan method in construction," Waste Management vol. 28, 2008.
[12] Bell, "Waste minimization and resource recovery," The environmental design guide, vol. 2, 1998.
[13] C. Poon, "Reducing construction waste," Waste Management vol. 27, no. 12, 2007.
[14] M. Sartipipour, "Opportunity for recycling materials in post-traumatic reconstruction (research on concrete)," maskan & mohite roosta, vol. 152, 2014.
[15] Y. A. Poon CS, Ng LH, "On-site sorting of construction and demolition waste in Hong Kong," Resources, Conservation and Recycling, vol. 32, no. 2, pp. 157-72, 2001.
[16] T. A. Wang JY, Christoforou C, Fadlalla H, "A system analysis tool for construction and demolition wastes management.," Waste Management, vol. 24, no. 10, pp. 989-97, 2004.
[17] S. D. Peng CL, Kitbert CJ, "Peng CL, Scorpio DE, Kitbert CJ. Strategies for successful construction and demolition waste recycling operations," Construction Management and Economics, vol. 15, no. 1, pp. 49-58, 1997.
[18] T. C. Tam VWY, "Evaluation of existing waste recycling methods: a Hong Kong study," Building and Environment, vol. 41, no. 12, pp. 1649-60, 2006.
[19] Y. H. Shen LY, Alan G, "Improving environmental performance by means of empowerment of contractors," Management of Environmental Quality: An International Journal of Advanced Concrete Technology, vol. 17, no. 3, pp. 242-57, 2006.
[20] H. P. Yuan, L. Y. Shen, J. J. L. Hao, and W. S. Lu, "A model for cost–benefit analysis of construction and demolition waste management throughout the waste chain," Resources, Conservation and Recycling, vol. 55, no. 6, pp. 604-612, 2011.
[21] H. M. Hao JL, Shen LY, "Managing construction waste on-site through system dynamics modeling: the case of Hong Kong," Engineering, Construction andArchitectural Management, vol. 15, no. 2, pp. 103-13, 2008.
[22] T. Wang, J. Wang, P. Wu, J. Wang, Q. He, and X. Wang, "Estimating the environmental costs and benefits of demolition waste using life cycle assessment and willingness-to-pay: A case study in Shenzhen," Journal of Cleaner Production, vol. 172, pp. 14-26, 2018.
[23] S. E. Mills TH, Jarman D, "A cost effective waste management plan," Cost Engineering, Construction and Architectural Management, vol. 41, no. 3, pp. 35-43, 1999.
[24] L. H. Duran X, O’Regan B, "A model for assessing the economic viability of construction and demolition waste recycling—the case of Ireland," Resources,Conservation and Recycling vol. 46, no. 3, pp. 302-20, 2006.
[25] H. Guo, "A System Dynamics Model for Construction Waste Resource Recovery Management in China," Revista de la Facultad de Ingeniería, vol. 31, no. 6, 2016.
[26] J. Won and J. C. Cheng, "Identifying potential opportunities of building information modeling for construction and demolition waste management and minimization," Automation in Construction, vol. 79, pp. 3-18, 2017.
[27] S. Jia, G. Yan, A. Shen, and J. Zheng, "Dynamic simulation analysis of a construction and demolition waste management model under penalty and subsidy mechanisms," Journal of cleaner production, vol. 147, pp. 531-545, 2017.
[28] Z. Ding, M. Zhu, V. W. Tam, G. Yi, and C. N. Tran, "A system dynamics-based environmental benefit assessment model of construction waste reduction management at the design and construction stages," Journal of cleaner production, vol. 176, pp. 676-692, 2018.
[29] B. Huang, X. Wang, H. Kua, Y. Geng, R. Bleischwitz, and J. Ren, "Construction and demolition waste management in China through the 3R principle," Resources, Conservation and Recycling, vol. 129, pp. 36-44, 2018.
[30] T. M. Mak et al., "Extended theory of planned behaviour for promoting construction waste recycling in Hong Kong," Waste management, vol. 83, pp. 161-170, 2019.
[31] O. P. Richardson GP, "Application of system dynamics in marketing: editorial," Journal of Business Research vol. 61, no. 11, pp. 1099-101, 2008.
[32] Z. Ding, M. Zhu, V. W. Y. Tam, G. Yi, and C. N. N. Tran, "A system dynamics-based environmental benefit assessment model of construction waste reduction management at the design and construction stages," Journal of Cleaner Production, vol. 176, pp. 676-692, 2018/03/01/ 2018.
[33] A. Rodrigues and J. Bowers, "The role of system dynamics in project management," International Journal of Project Management, vol. 14, no. 4, pp. 213-220, 1996/08/01/ 1996.
[34] L. P. Li H, Drew DS, "Effects of overtime work and additional resources on project cost and quality," Engineering, Construction an Architectural Management, vol. 7, no. 3, pp. 211-20, 2000.
[35] Y. H. Wang JY, "On-site construction waste management model based on system dynamics. ," Science & Technology Progress and Policy, vol. 25, no. 10, pp. 74-8, 2008.
[36] C. R. Elias AA, Jackson LS, "Linking stakeholder literature and system dynamics: opportunities for research.," presented at the In: First International Conference on Systems Thinking in Management, 2000.
[37] C. N. Dyson B, "Forecasting municipal solid waste generation in a fastgrowing urban region with system dynamics modeling," Waste Management, vol. 25, pp. 669-79, 2005.
[38] H. M. Hao JL, Huang T, "A simulation model using system dynamic method for construction and demolition waste management in Hong Kong," Journal of Construction Innovation vol. 7, no. 1, pp. 7-21, 2007.
[39] W. Y. Shen LY, Chan EHW, Hao JL, "Application of system dynamics for assessment of sustainable performance of construction projects," Journal of Zhejiang University Science & Technology Progress and Policy, vol. 6, no. 4, pp. 339-49, 2005.
[40] J. D. Sterman, Business Dynamics Systems Thinking and Modeling for a Complex World. McGraw-Hill Companies, 2000, p. 1008.
[41] Q. Cui, H.-b. Kuang, C.-y. Wu, and Y. Li, "Dynamic formation mechanism of airport competitiveness: The case of China," Transportation Research Part A: Policy and Practice, vol. 47, pp. 10-18, 2013/01/01/ 2013.
[42] H. Qudrat-Ullah and B. S. Seong, "How to do structural validity of a system dynamics type simulation model: The case of an energy policy model," Energy policy, vol. 38, no. 5, pp. 2216-2224, 2010.
[43] H. Klee, "The Cement Sustainability Initiatve," World Business Counsil for Sustainable Development, 2009.