[1] Peters, A., et al.,(2020).Understanding the emerging coronavirus: what it means for health security and infection prevention. Journal of Hospital Infection.
[2] World Health Organization, (2020), Coronavirus disease (COVID-19) Situation Report –134.
[4] J. R. C. Jimenez, A. A. Sasaki, P. F. M. Simbulas, J. S. Buluran.(2023). “Impact of COVID-19 on the Effectiveness of Safety Practices on Construction Projects: A Comparative Analysis Framework of Health and Risk Assessment”.1st edition.page13. ISBN:9781003341963
[5] Anjomshoa, E., & Tabatabaei Mirhosseini, R. (2022). Identify and ranking of effective factors in changing urban infrastructure for a carbon-free and sustainable future. Journal of Structural and Construction Engineering. doi: 10.22065/jsce.2022.337222.2774
[6] Pinsheng Duan, Yang Miang Goh, Jianliang Zhou. (2023). “The impact of COVID-19 pandemic on construction safety in China and the U.S.: A comparative study,Safety Science,Volume 161,106076,ISSN 0925-7535,https://doi.org/10.1016/j.ssci.2023.106076.
[7] Donthu N, Gustafsson A.(2020). “Effects of COVID-19 on business and research”. J Bus Res.Sep;117:284-289. doi: 10.1016/j.jbusres.2020.06.008. Epub 2020 Jun 9. PMID: 32536736; PMCID: PMC7280091.
[8] Andrew Ebekozien, Clinton Aigbavboa & Marvelous Aigbedion (2023) Construction industry post-COVID-19 recovery: Stakeholders perspective on achieving sustainable development goals, International Journal of Construction Management, 23:8, 1376-1386, DOI:
10.1080/15623599.2021.1973184
[9] Rani HA, Farouk AM, Anandh KS, Almutairi S, Rahman RA.(2022). “Impact of COVID-19 on Construction Projects: The Case of India. Buildings”. 12(6):762. https://doi.org/10.3390/buildings12060762
[10] Babatunde A. Salami, Saheed O. Ajayi & Adekunle S. Oyegoke (2023) Tackling the impacts of Covid-19 on construction projects: an exploration of contractual dispute avoidance measures adopted by construction firms, International Journal of Construction Management, 23:7, 1196-1204, DOI:
10.1080/15623599.2021.1963561
[11] Davide Bazzana, Jed J. Cohen, Nicolò Golinucci, Manfred Hafner, Michel Noussan, Johannes Reichl, Matteo Vincenzo Rocco, Alessandro Sciullo, Sergio Vergalli. (2022). “A multi-disciplinary approach to estimate the medium-term impact of COVID-19 on transport and energy”: A case study for Italy,Energy,Volume 238, Part C,122015,ISSN 0360-5442,https://doi.org/10.1016/j.energy.2021.122015.
[12] J, Rajprasad & V, Thamilarasu & N, Mageshwari. (2018). Role of Crisis Management in Construction Projects. International Journal of Engineering & Technology. 7. 451. 10.14419/ijet.v7i2.12.11515.
[13] Buchholz, U., Knorre, S. (2023). Crisis Management. In: Internal communication and management. Springer, Wiesbaden. https://doi.org/10.1007/978-3-658-38614-6_11
[14] Kesavan, S. (2016). "Project Management in Times of Crisis." Paper presented at the Abu Dhabi International Petroleum Exhibition & Conference, Abu Dhabi, UAE, November 2016. doi:
https://doi.org/10.2118/182951-MS
[15] Chapman, C. Ward S., (1996). Project risk management: processes, techniques and insights : John Wiley.
[16] Anjomshoa, E., & Karbakhsh, A. (2023). “Investigating The Safety Level of Urban Deep Excavation Projects Stabilized by Method of Braced Excavations (struts) Using Methods Based on Risk Assessment and Failure Analysis”. Journal of Structural and Construction Engineering. doi: 10.22065/jsce.2023.374031.2980
[17] Papachatzi, Dimitra & Xenidis, Yiannis. (2019). Risk management in construction projects using building information modelling. 198-206. 10.35490/EC3.2019.199.
[18] PMI Standards Committee. (2017). A guide to the project management body of knowledge (PMBOK® guide) (6th ed.). Project Management Institute
[19]
Sutterby, P.,
Wang, X.,
Li, H.X. and
Ji, Y. (2023), "The impact of COVID-19 on construction supply chain management: an Australian case study",
Engineering, Construction and Architectural Management, Vol.
https://doi.org/10.1108/ECAM-10-2021-0942
[20] Ooi, Zi Quan (2023). “The Impacts of the COVID-19 Pandemic on the Execution of Construction Projects in Kuala Lumpur”. Final Year Project (Bachelor), Tunku Abdul Rahman University College.
[22] Jagun, Z.T., Nyakuma, B.B., Daud, D. et al.(2022). “Property development during the COVID-19 pandemic: challenges and outlook in Malaysia”. Environ Sci Pollut Res 29, 85717–85726 .
https://doi.org/10.1007/s11356-021-18378-2
[24] Raoufi M. Fayek A. (2022). “New Modes of Operating for Construction Organizations during the COVID-19 Pandemic: Challenges, Actions, and Future Best Practices”. Journal of Management in Engineering. Vol.38. No.2. DOI: 10.1061/(ASCE)ME.1943-5479.0001009
[25] Umar, T. (2022). “The Impact of COVID-19 on the GCC Construction Industry”. International Journal of Service Science, Management, Engineering, and Technology (IJSSMET), 13(2), 1-17.
http://doi.org/10.4018/IJSSMET.20220301.oa1
[27] Alsharef A, Banerjee S, Uddin SMJ, Albert A, Jaselskis E.(2021). “Early Impacts of the COVID-19 Pandemic on the United States Construction Industry”.
International Journal of Environmental Research and Public Health.18(4):1559.
https://doi.org/10.3390/ijerph18041559
[28] Gamil, Y., & Alhagar, A. (2020). “The Impact of the Pandemic Crisis on the Survival of Construction Industry: A Case of COVID-19”. Mediterranean Journal of Social Sciences, 11, 122-128.
https://doi.org/10.36941/mjss-2020-0047
[29] Al-Mhdawi, M. K.S., Brito, Mario P., Abdul Nabi, Mohamad, El-Adaway, Islam H. and Onggo, Bhakti Stephan (2022). “Capturing the impact of COVID-19 on construction projects in developing countries: a case study of Iraq”. Journal of Management in Engineering, 38 (1),
doi:10.1061/(ASCE) ME.1943-5479.0000991.
[30] Ramy Khalef, Gasser G. Ali, Islam H. El-adaway & Ghada M. Gad (2022). “Managing construction projects impacted by the COVID-19 pandemic: a contractual perspective”, Construction Management and Economics, 40:4, 313-330, DOI:
10.1080/01446193.2022.2031238
[31] Saebnia S., Karimi F, (2020). A survey the Impact of Corona Disease (Covid-19) on Business Performance of Small and medium businesses of Ardabil province,, Journal of Accounting and Management vision, 3(24), 83-93.
[32] Shokravi H. (2019) , investigating the impact of the spread of the corona virus on the implementation process of construction projects in the form of project management knowledge scope processes (PMBOK), international conference on civil engineering, architecture, development and regeneration of urban infrastructure in Iran, Tehran.
[33] Garcia-Melon. Monica, Javier Ferris-Onate, Jeronimo Aznar-Bellver , Pablo Aragoné1-Beltran, and Rocio Poveda-Bautista. (2008). Farmland appraisal based on the analytic network Process. Global Optimization. 42 (2). 143-155.
[34] Nejati,M. (2018). Ranking of companies participating in the tenders of Imam Khomeini Oil Refining Company Shazand using multi-objective decision-making techniques (MODM). M.Sc. Islamic Azad University, Arak Branc, Faculty of Engineering - Department of Industrial Engineering.
[35] Ayag, Z. Ozdemir, G. R. (2012). Evaluating machine tool alternatives through modified TOPSIS and alpha-cut based fuzzy ANP. International Journal of Production Economics. 140 (2). 630–636.
[36] Tseng, M. L., Lin, Y. H., Chiu, A. S. F., and Liao, J. C. H.; “Using FANP approach on selection of competitive priorities based on cleaner production implementation: a case study in PCB manufacturer, Taiwan”; Clean Technologies and Environmental Policy 10 No 1 (2008) 17–29.
[37] He,Q., Luo,L., Hu,Y. and Chan,A.P.C.; “Measuring the complexity of mega construction projects in China—A fuzzy analytic network process analysis”; International Journal of Project Management 17 (2014) 269-73
[38] Razavi Toosi, S. L., Valey Samani, J. M., & Fahmi, H. (2015). A New Fuzzy Analytical Network Process Method for Watershed Ranking. Iran-Water Resources Research, 11(1), 61-72.
[39] Shyur, H-J. and Shih,H.-S.; “A hybrid MCDM model for strategic vendor selection”; Mathematical and Computer Modeling 44 No 7-8 (2006) 749-761.
[40] Hwang, C.L. and Yoon, K. (1981) Multiple Attribute Decision Making: Methods and Applications. Springer-Verlag,NewYork. http://dx.doi.org/10.1007/978-3-642-48318-9