[1] Bribián, I. Z., Capilla, A. V., & Usón, A. A. (2011). Life cycle assessment of building materials: Comparative analysis of energy and environmental impacts and evaluation of the eco-efficiency improvement potential. Building and Environment, 46(5), 1133-1140.
[2] Sinha, A., Gupta, R., & Kutnar, A. (2013). Sustainable Development and Green Buildings. Drvna industrija, 64(1), 45-53.
[3] Bahaudin, A. Y., Elias, E. M., & Saifudin, A. M. (2014). A comparison of the green building's criteria. E3S Web of Conferences,
[4] Poveda, C. A., & Young, R. (2015). Potential benefits of developing and implementing environmental and sustainability rating systems: Making the case for the need of diversification. International Journal of Sustainable Built Environment, 4(1), 1-11.
[5] Yang, R. J., & Zou, P. X. (2014). Stakeholder-associated risks and their interactions in complex green building projects: A social network model. Building and Environment, 73, 208-222.
[6] Council, U. G. B. (2009). The Legal Risk in’Building Green’: New Wine in Old Bottles?. USGBC Panel Discussion White Paper.
[7] Guide, P. (2004). A guide to the project management body of knowledge. Project Management Institute,
[8] Rose, K. H. (2013). A Guide to the Project Management Body of Knowledge (PMBOK® Guide)—Fifth Edition. Project management journal, 44(3).
[9] Gajewska, E., & Ropel, M. (2011). Risk Management Practices in a Construction Project–a case study. Swedia, Chalmers University of Technology.
[10] Zou, P. X., & Couani, P. (2012). Managing risks in green building supply chain. Architectural Engineering and Design Management, 8(2), 143-158.
[11] Hwang, B. G., Zhao, X., See, Y. L., & Zhong, Y. (2015). Addressing risks in green retrofit projects: The case of Singapore. Project Management Journal, 46(4), 76-89.
[12] Qin, X., Mo, Y., & Jing, L. (2016). Risk perceptions of the life-cycle of green buildings in China. Journal of Cleaner Production, 126, 148-158.
[13] Zhao, X., Hwang, B.-G., & Gao, Y. (2016). A fuzzy synthetic evaluation approach for risk assessment: a case of Singapore's green projects. Journal of Cleaner Production, 115, 203-213.
[14] Tao, X., & Xiang-Yuan, S. (2018). Identification of Risk in Green Building Projects based on the Perspective of Sustainability. IOP Conference Series: Materials Science and Engineering, 439(3), 032053.
[15] Chan, A. P. C., Darko, A., Olanipekun, A. O., & Ameyaw, E. E. (2018). Critical barriers to green building technologies adoption in developing countries: The case of Ghana. Journal of Cleaner Production, 172, 1067-1079.
[16] Ahmad, T., Aibinu, A. A., & Stephan, A. (2019). Managing green building development – A review of current state of research and future directions. Building and Environment, 155, 83-104.
[17] Zhang, X., & Mohandes, S. R. (2020). Occupational Health and Safety in green building construction projects: A holistic Z-numbers-based risk management framework. Journal of Cleaner Production, 275, 122788.
[18] Guan, L., Abbasi, A., & Ryan, M. J. (2020). Analyzing green building project risk interdependencies using Interpretive Structural Modeling. Journal of Cleaner Production, 256, 120372.
[19] Abdul-Malak, M.-A. U., & Khalife, F. G. (2020). Managing the Risks of Third-Party Sustainability Certification Failures. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 12, 04520027.
[20] Zeng, J., An, M., & Smith, N. J. (2007). Application of a fuzzy based decision making methodology to construction project risk assessment. International journal of project management, 25(6), 589-600.
[21] Zhang, G., & Zou, P. X. (2007). Fuzzy analytical hierarchy process risk assessment approach for joint venture construction projects in China. Journal of Construction Engineering and Management, 133(10), 771-779.
[22] Askari, M., Shokrizadeh, H. R., & Ghane, N. (2014). A Fuzzy AHP Model in Risk Ranking. European Journal of Business and Management, 6(14), 194-202.
[23] Roghanian, E., & Mojibian, F. (2015). Using fuzzy FMEA and fuzzy logic in project risk management. Iranian Journal of Management Studies, 8(3), 373-395.
[24] Yuliatti, M. M. E., & Hardi Purba, H. (2021). Construction Project Risk Analysis Based on Fuzzy Analytical Hierarchy Process (F-AHP): A Literature Review. Advance Researches in Civil Engineering, 3(3), 1-20.
[25] Cronbach, L.J., (1951). Coefficient alpha and the internal structure of tests. Psychometrika,16(3), 334-297.
[26] Godsipour, H., (2000). Analytical hierarchy process (AHP). Amirkabir University of Technology Publishing Center.
[27] Van Laarhoven, P., & Pedrycz, W. (1983). A fuzzy extension of Saaty's priority theory. Fuzzy sets and Systems, 11(1-3), 229-241.
[28] Chang, D.-Y. (1996). Applications of the extent analysis method on fuzzy AHP. European journal of operational research, 95(3), 649-655.
[29] Zadeh, L. A. (1965). Information and control. Fuzzy sets, 8(3), 338-353.
[30] Srichetta, P., & Thurachon, W. (2012). Applying fuzzy analytic hierarchy process to evaluate and select product of notebook computers. International Journal of Modeling and Optimization, 2(2), 168.
[31] Gogus, O., & Boucher, T. O. (1998). Strong transitivity, rationality and weak monotonicity in fuzzy pairwise comparisons. Fuzzy Sets and Systems, 94(1), 133-144.