[1] Khazaeni, G., Khanzadi, M., Afshar, A. (2012). Optimum risk allocation model for construction contracts: fuzzy
TOPSIS approach. Canadian Journal of Civil Engineering, 39(7), 789-800.
[2] KarimiAzari, A., Mousavi, N., Mousavi, S.F., Hosseini, S. (2011). Risk assessment model selection in construction
industry. Expert Systems with Applications, 38 (8), 9105-9111.
[3] Wang, Y. (2013). Construction Project Risk Assessment. In: Xu J, Yasinzai M, Lev B (eds) Proceedings of the Sixth
International Conference on Management Science and Engineering Management: Focused on Electrical and
Information Technology. Springer London, London, pp 839-844.
[4] Project Management Institute, (2004). A guide to the project management body of knowledge (PMBOK guide).
Newtown Square, Pa: Project Management Institute.
[5] Flanagan, R., Norman, G. , (1993). Risk Management and Construction. Victoria: Blackwell, Science Pty Ltd, Australia.
[6] Aminbakhsh, S., Gunduz, M., Sonmez, R. (2013), Safety risk assessment using analytic hierarchy process (AHP) during
planning and budgeting of construction projects. Journal of Safety Research, 46, 99-105.
[7] Winch, G. (2002). Managing Construction Projects: An Information Processing Approach. Wiley.
[8] Tah, J.H.M., Carr, V. (2000). A proposal for construction project risk assessment using fuzzy logic. Construction
Management and Economics, 18 (4), 491-500.
[9] Nieto-Morote ,A., Ruz-Vila, F. (2011). A fuzzy approach to construction project risk assessment. International Journal
of Project Management, 29(2), 220-231.
[10] Taylan, O., Bafail, A. O., Abdulaal, R.M.S., Kabli, M.R., (2014), Construction projects selection and risk assessment
by fuzzy AHP and fuzzy TOPSIS methodologies. Applied Soft Computing, 17, 105–116.
[11] Yazdani-Chamzini, A. (2014). Proposing a new methodology based on fuzzy logic for tunnelling risk assessment.
Journal of Civil Engineering and Management, 20(1), 82-94.
[12] El-Sayegh, S.M., Mansour, M.H. (2015). Risk Assessment and Allocation in Highway Construction Projects in the
UAE. Journal of Management in Engineering, 31(6), 15-22.
[13] Samantra, C., Datta, S., Mahapatra, S.S. (2017). Fuzzy based risk assessment module for metropolitan construction
project: An empirical study. Engineering Applications of Artificial Intelligence, In press, Doi:
https://doi.org/10.1016/j.engappai.2017.04.019.
[14] Wang, T., Wang, S., Zhang, L., Huang, Z., Li, Y. (2016). A major infrastructure risk-assessment framework:
Application to a cross-sea route project in China. International Journal of Project Management 34(7): 1403-1415.
[15] Islam, M. S., M. P. Nepal, M. Skitmore and M. Attarzadeh (2017). "Current research trends and application areas of
fuzzy and hybrid methods to the risk assessment of construction projects. Advanced Engineering Informatics, 33, 112-
131.
[16] Chau Ngoc, D., Long, L.H., Soo-Yong, K., Chau Van, N., Young-Dai, L., Sun-Ho, L. (2017). Identification of risk
patterns in Vietnamese road and bridge construction: Contractor’s perspective. Built Environment Project and Asset
Management, 7(1), 59-72.
975 نشریه علمی – پژوهشی مهندسی سازه و ساخت، دوره 5، شماره ویژه 4، سال 9317 ، صفحه 951 تا 975
[17] Chapman, C.B., Ward, S.C. (2003). Project risk management: Processes, Techniques and Insights, John Wiley, Second
edition. UK: Chichester.
[18] Saaty, T.L., Vargas, L.G. (2006). Decision making with the analytic network process: economic, political, social and
technological applications with benefits, opportunities, costs and risks, New York: Springer.
[19] Leung, L., Lam, K., Cao, D. (2006). Implementing the balanced scorecard using the analytic hierarchy process the
analytic network process. Journal of the Operational Research Society, 57(6), 682–691.
[20] Tesfamariam, S., Sadiq, R., (2006). Risk-based environmental decision-making using fuzzy analytic hierarchy process
(F-AHP), Stochastic Environmental Research and Risk Assessment, 21, 35–50.
[21] Wei, W. W. and Yu, T. L. (2007). Developing global managers' competencies using the fuzzy DEMATEL method.
Expert System Application, 32(2), 499-507.
[22] Wu, H. Y., Tzeng, G. H., Chen, Y. H. (2009). A fuzzy MCDM approach for evaluating banking performance based on
Balanced Scorecard, Expert Systems with Applications, 36, 10135–10147.
[23] Opricovic, S., and Tzeng, G.H. (2007). Extended VIKOR method in comparison with outranking methods. European
Journal of Operational Research, 178(2), 514–529.
[24] Shemshadi, A., Shirazi, H., Toreihi, M., Tarokh M.J. (2011). A fuzzy VIKOR method for supplier selection based on
entropy measure for objective weighting. Expert Systems with Applications, 38(10), 12160-12167.
[25] Hosseini Nia, H., Farrokh, M. (2014). A Vendor Selection Model Based on ANP and VIKOR under Fuzzy
Environment. Global Journal of Management Studies and Researches, 1(2), 62-72.