[1] Mattias Yllén, Johansson. (2012). Agile project management in the construction industry - An inquiry of the opportunities in construction projects. PhD. Real Estate and Construction Management Department
[2] Roemer TA, Ahmadi R and Wang RH. (2000). Time–cost trade-off in overlapped product development. Operations Research, vol. 48, no. 6, pp.858–865
[3] Bosch-Rekveldt, M. (2011). Managing project complexity: A study into adapting early project phases to improve project performance in large engineering projects. Delft University of Technology
[4] Priemus, H., Van Wee, B. (2013). International Handbook on Mega-projects: Edward Elgar Publishing.
[5] Gabrial, E. (1997). The lean aooroach to project management. International Journal of project management 15 (4), 205-209.
[6] Qin, Ruwen., A. Nembhard, David. (2014). Workforce agility in operations management. Surveys in Operations Research and Management Science, 20 (2015), 55-69.
[7] Cooke, J. L. (2012). Everything you want to know about agile IT governance publishing
[8] Sohi, A.J., Hertogh, M., Bosch-Rekveldt, M., Blom, R. (2016). Does Lean & Agile Project Management Help Coping with Project Complexity?. Procedia-Social and Behavioral Sciences, 252-259.
[9] Gregory, Peggy. and Barroca, Leonor. and Sharp, Helen. and Deshpande, Advait. and Taylor, Katie. (2016). The challenges that challenge: Engaging with agile practitioners’ concerns. Information and Software Technology, 1–13.
]10[ فارسیجانی، ح. ، قیومی قهرودی، ص. (1390). شناسایی و اولویتبندی موانع چابکی بنگاههای اقتصادی. چشم انداز مدیریت صنعتی، صفحات 120-90.
[11] Antlova, Klara. (2014). Agile approach in the project management of the Czech companies. Procedia Technology, 16, 929-933.
[12] Loforte Ribeiro Manuela Timóteo Fernandes, Francisco. (2010). Exploring agile methods in construction small and medium enterprises: a case study. Enterprise Information Management, 23(2), 161-180.
[13] Owen, Robert. and Koskela, Lauri. and Henrich, Guilherme. and Codinhoto, Ricardo. (2006). Is Agile Project Management applicable to construction?.Proceedings IGLC, 14, 51-66.
[14] Chen, Qian. and Reichard, Georg. and Beliveau, Yvan. (2007).interface management—a facilitator of lean construction and agile project management. Proceedings IGLC, 15, 57-66.
]15[خزاعی امین، ع. ، خزاعی امین، م.، آقائی، و ح. (1392). ضرورت توجه به چابکی سازمانی در سازمانهای کنونی. دومین همایش ملی علوم مدیریت نوین،.
[16] Serrador, Pedro. and K. Pinto, Jeffrey. (2015). Does Agile work? — A quantitative analysis of agile project success. International Journal of Project Management, 16, 1-12.
[17] G. Cobb, Charles. (2011). Making Sense of Agile Project Management: Balancing Control and Agility. simultaneously in Canada New Jersey: John Wiley & Sons, Inc., Hoboken, 265.
]18[ ظهوری زنگنه، ن. (1390). استفاده از مدیریت پروژه چابک برای اجرای پروژه های 35 ماهه پارس. هفتمین کنفرانس بین المللی مدیریت پروژه.
]19[سلیمی چگنی، ا. (1395). بررسی اجرای مدیریت پروژه چابک در پروژه های پالایشگاهی. کنفرانس بین المللی مهندسی صنایع و مدیریت.
[20] Tomek, Radan. And Kalinichuk, Sergey. (2013). Agile PM and BIM: A hybrid scheduling approach for a technological construction project, Procedia Engineering, 123, 557-564.
[21] Carlos Conforto, Edivandro. And Capaldo Amaral, Daniel. And Luis da Silva, Sergio. And Di Felippo, Ariani. And Simon L. Kamikawachi, Dayse. (2016). The agility construct on project management theory. International Journal of Project Management, 34, 660-674.
[22]Tomek, R. and S. Kalinichuk, Agile PM and BIM: A Hybrid Scheduling Approach for a Technological Construction Project. Procedia Engineering, 2015. 123: p. 557-564.
[23] Cohn, M., Agile estimating and planning. 2005: Pearson Education.
[24] Lu, W., T. Olofsson, and L. Stehn, A lean‐agile model of homebuilders’ production systems. Construction Management and Economics, 2011. 29(1): p. 25-35.
[25] Vinodh, S., et al., Agility index measurement using multi-grade fuzzy approach integrated in a 20 criteria agile model. International Journal of Production Research, 2010. 48(23): p. 7159-7176
[26] Cochran, W.G. (1977) Sampling Techniques. 3rd Edition, New York: John Wiley & Sons.
[27] Rahimi, y. and Razmi, J. and Cheraghi, E. and Shojaie, S. (2017). Design model innovative construction supply chain management with measurement agility and analysis COQ: An Empirical study. Scientia Iranica.21.
[28] Shannon, C., BA mathematical theory of communication,[Bell System Tech. J, 1948. 27(3): p. 379423.
[29] Hwang, C.L. Yoon, K. (1981). Multiple Attribute Decision Making: Methods and Applications. New York: Springer-Verlag.